| 1 | 716770 | INSTALACION DE FAENAS (M01- OBRAS PRELIMINARES) | GLB | 1 |
| 2 | 716771 | LETRERO DE OBRAS MURO DE LADRILLO E=18 CM (M01- OBRAS PRELIMINARES) | PZA | 1 |
| 3 | 716772 | LETRERO DE IDENTIFICACION DE OBRAS DE MADERA (M01- OBRAS PRELIMINARES) | PZA | 1 |
| 4 | 716773 | ANALISIS DE AGUA FISICO QUIMICO Y BACTERIOLOGICO (M01- OBRAS PRELIMINARES) | UND | 4 |
| 5 | 716774 | REPLANTEO Y TRAZADO (M02- OBRA DE TOMA 1 CAPTACION TOMA DE LADERA) | M2 | 6,22 |
| 6 | 716775 | EXCAVACION COMUN SUELO SEMIDURO 0-2 M (M02- OBRA DE TOMA 1 CAPTACION TOMA DE LADERA) | M3 | 3,06 |
| 7 | 716776 | FILTRO DE GRAVA D=0.6 - 5 CM (M02- OBRA DE TOMA 1 CAPTACION TOMA DE LADERA) | M3 | 1,51 |
| 8 | 716777 | LOSA HORMIGON ARMADO H21 PEQUEÑAS ESTRUCTURAS (M02- OBRA DE TOMA 1 CAPTACION TOMA DE LADERA) | M3 | ,3 |
| 9 | 716778 | HORMIGON CICLOPEO FUNDACIONES H18 50% P.D. (M02- OBRA DE TOMA 1 CAPTACION TOMA DE LADERA) | M3 | 1,18 |
| 10 | 716779 | HORMIGON CICLOPEO ELEVACIONES H18 50% P.D. (M02- OBRA DE TOMA 1 CAPTACION TOMA DE LADERA) | M3 | 2,06 |
| 11 | 716780 | REVOQUE INTERIOR IMPERMEABLE (M02- OBRA DE TOMA 1 CAPTACION TOMA DE LADERA) | M2 | 4,32 |
| 12 | 716781 | REVOQUE EXTERIOR CEMENTO (M02- OBRA DE TOMA 1 CAPTACION TOMA DE LADERA) | M2 | 7,66 |
| 13 | 716782 | PROVISION Y COLOCADO DE ACCESORIOS OBRA DE TOMA 1 (M02- OBRA DE TOMA 1 CAPTACION TOMA DE LADERA) | GLB | 1 |
| 14 | 716783 | TAPA METALICA E=1/8 0.87X0.87 (M02- OBRA DE TOMA 1 CAPTACION TOMA DE LADERA) | PZA | 1 |
| 15 | 716784 | TAPA METALICA E=1/8 0.80X0.70 (M02- OBRA DE TOMA 1 CAPTACION TOMA DE LADERA) | PZA | 1 |
| 16 | 716785 | REPLANTEO Y TRAZADO (M03 - OBRA DE TOMA 2 CAPTACION TOMA DE LADERA) | M2 | 6,22 |
| 17 | 716786 | EXCAVACION COMUN SUELO SEMIDURO 0-2 M (M03 - OBRA DE TOMA 2 CAPTACION TOMA DE LADERA) | M3 | 3,06 |
| 18 | 716787 | FILTRO DE GRAVA D=0.6 - 5 CM (M03 - OBRA DE TOMA 2 CAPTACION TOMA DE LADERA) | M3 | 1,51 |
| 19 | 716788 | LOSA HORMIGON ARMADO H21 PEQUEÑAS ESTRUCTURAS (M03 - OBRA DE TOMA 2 CAPTACION TOMA DE LADERA) | M3 | ,3 |
| 20 | 716789 | HORMIGON CICLOPEO FUNDACIONES H18 50% P.D. (M03 - OBRA DE TOMA 2 CAPTACION TOMA DE LADERA) | M3 | 1,18 |
| 21 | 716790 | HORMIGON CICLOPEO ELEVACIONES H18 50% P.D. (M03 - OBRA DE TOMA 2 CAPTACION TOMA DE LADERA) | M3 | 2,06 |
| 22 | 716791 | REVOQUE INTERIOR IMPERMEABLE (M03 - OBRA DE TOMA 2 CAPTACION TOMA DE LADERA) | M2 | 4,32 |
| 23 | 716792 | REVOQUE EXTERIOR CEMENTO (M03 - OBRA DE TOMA 2 CAPTACION TOMA DE LADERA) | M2 | 7,66 |
| 24 | 716793 | PROVISION Y COLOCADO DE ACCESORIOS OBRA DE TOMA 2 (M03 - OBRA DE TOMA 2 CAPTACION TOMA DE LADERA) | GLB | 1 |
| 25 | 716794 | TAPA METALICA E=1/8 0.87X0.87 (M03 - OBRA DE TOMA 2 CAPTACION TOMA DE LADERA) | PZA | 1 |
| 26 | 716795 | TAPA METALICA E=1/8 0.80X0.70 (M03 - OBRA DE TOMA 2 CAPTACION TOMA DE LADERA) | PZA | 1 |
| 27 | 716796 | REPLANTEO Y CONTROL DE LINEAS DE TUBERIA (M04 - ADUCCION) | ML | 5564 |
| 28 | 716797 | EXCAVACION COMUN SUELO SEMIDURO 0-2 M (M04 - ADUCCION) | M3 | 64,72 |
| 29 | 716798 | EXCAVACION COMUN SUELO DURO 0-2 M (M04 - ADUCCION) | M3 | 694,32 |
| 30 | 716799 | RELLENO Y COMPACTADO CON MATERIAL COMUN (M04 - ADUCCION) | M3 | 759,04 |
| 31 | 716800 | PROV. Y TENDIDO TUBERIA SUPERTUBO HDPE 50MM (1 1/2) PN-8 (M04 - ADUCCION) | ML | 583,17 |
| 32 | 716801 | PROV. Y TENDIDO TUBERIA SUPERTUBO HDPE 90MM (3) PN-8 (M04 - ADUCCION) | ML | 5431,1 |
| 33 | 716802 | PROV. E INST. TUBERIA SUPERTUBO HDPE 75MM (2 1/2) PN-8 (M04 - ADUCCION) | ML | 1115,73 |
| 34 | 716803 | PRUEBA HIDRAULICA Y DESINFECCION TUBERIA 1 1/2 A 3 (M04 - ADUCCION) | ML | 7130 |
| 35 | 716804 | REPLANTEO Y TRAZADO (M05 - PASOS DE QUEBRADA) | ML | 1566 |
| 36 | 716805 | EXCAVACION COMUN SUELO DURO 0-2 M (M05 - PASOS DE QUEBRADA) | M3 | 66,34 |
| 37 | 716806 | HORMIGON CICLOPEO FUNDACIONES H18 50% P.D. (M05 - PASOS DE QUEBRADA) | M3 | 66,34 |
| 38 | 716807 | PROV. Y COLOC. DE ACCESORIOS PASO DE QUEBRADA L= 6 M +/- 1 M (M05 - PASOS DE QUEBRADA) | UND | 1 |
| 39 | 716808 | PROV. Y COLOC. DE ACCESORIOS PASO DE QUEBRADA L= 10 M +/- 2M (M05 - PASOS DE QUEBRADA) | UND | 8 |
| 40 | 716809 | PROV. Y COLOC. DE ACCESORIOS PASO DE QUEBRADA L= 15 M +/- 2M (M05 - PASOS DE QUEBRADA) | UND | 9 |
| 41 | 716810 | PROV. Y COLOC. DE ACCESORIOS PASO DE QUEBRADA L= 20 M +/- 2M (M05 - PASOS DE QUEBRADA) | UND | 8 |
| 42 | 716811 | PROV. Y COLOC. DE ACCESORIOS PASO DE QUEBRADA L= 25 M +/- 2M (M05 - PASOS DE QUEBRADA) | UND | 8 |
| 43 | 716812 | PROV. Y COLOC. DE ACCESORIOS PASO DE QUEBRADA L= 30 M +/- 2M (M05 - PASOS DE QUEBRADA) | UND | 8 |
| 44 | 716813 | PROV. Y COLOC. DE ACCESORIOS PASO DE QUEBRADA L= 35 M +/- 2 (M05 - PASOS DE QUEBRADA) | UND | 6 |
| 45 | 716814 | PROV. Y COLOC. DE ACCESORIOS PASO DE QUEBRADA L= 40 M +/- 3 (M05 - PASOS DE QUEBRADA) | UND | 4 |
| 46 | 716815 | PROV. Y COLOC. DE ACCESORIOS PASO DE QUEBRADA L= 55 M +/- 3 (M05 - PASOS DE QUEBRADA) | UND | 1 |
| 47 | 716816 | PROV. Y COLOC. DE ACCESORIOS PASO DE QUEBRADA L= 65 M +/- 3 (M05 - PASOS DE QUEBRADA) | UND | 1 |
| 48 | 716817 | PROV. Y COLOC. DE ACCESORIOS PASO DE QUEBRADA L= 75 M +/- 3 (M05 - PASOS DE QUEBRADA) | UND | 1 |
| 49 | 716818 | PROV. Y COLOC. DE ACCESORIOS PASO DE QUEBRADA L= 90 M +/- 3 (M05 - PASOS DE QUEBRADA) | UND | 2 |
| 50 | 716819 | EXCAVACION COMUN SUELO SEMIDURO 0-2 M (M06 - PURGA DE LODO) | M3 | 2,21 |
| 51 | 716820 | MATERIAL DRENANTE BASE (M06 - PURGA DE LODO) | M3 | ,14 |
| 52 | 716821 | CAMARA DE Hº Cº H18 50% P.D. 70X70X70 CM (M06 - PURGA DE LODO) | PZA | 9 |
| 53 | 716822 | PROV. Y COLOC. ACC. CAMARA PURGA DE LODO ADUCCIÓN (M06 - PURGA DE LODO) | UND | 6 |
| 54 | 716823 | PROV. Y COLOC. ACC. CAMARA PURGA DE LODO RED DISTRIBUCION (M06 - PURGA DE LODO) | UND | 3 |
| 55 | 716824 | TAPA METALICA E=1/8 0.70X0.70 (M06 - PURGA DE LODO) | PZA | 9 |
| 56 | 716825 | EXCAVACION COMUN SUELO SEMIDURO 0-2 M (M07 - PURGA DE AIRE AUTOMATICO) | M3 | 2,7 |
| 57 | 716826 | MATERIAL DRENANTE BASE (M07 - PURGA DE AIRE AUTOMATICO) | M3 | ,18 |
| 58 | 716827 | CAMARA DE Hº Cº H18 50% P.D. 70X70X70 CM (M07 - PURGA DE AIRE AUTOMATICO) | PZA | 11 |
| 59 | 716828 | PROV. Y COLOC. ACC. CAMARA PURGA DE AIRE ADUCCIÓN (M07 - PURGA DE AIRE AUTOMATICO) | UND | 11 |
| 60 | 716829 | TAPA METALICA E=1/8 0.70X0.70 (M07 - PURGA DE AIRE AUTOMATICO) | PZA | 11 |
| 61 | 716830 | EXCAVACION COMUN SUELO SEMIDURO 0-2 M (M08 - VALVULA REDUCTORA DE PRESION RED DISTRIB) | M3 | ,25 |
| 62 | 716831 | MATERIAL DRENANTE BASE (M08 - VALVULA REDUCTORA DE PRESION RED DISTRIB) | M3 | ,02 |
| 63 | 716832 | CAMARA DE Hº Cº H18 50% P.D. 70X70X70 CM (M08 - VALVULA REDUCTORA DE PRESION RED DISTRIB) | PZA | 1 |
| 64 | 716833 | PROV. Y COLOC. ACC. VALVULA REDUCTORA DE PRESION (M08 - VALVULA REDUCTORA DE PRESION RED DISTRIB) | UND | 1 |
| 65 | 716834 | TAPA METALICA E=1/8 0.70X0.70 (M08 - VALVULA REDUCTORA DE PRESION RED DISTRIB) | PZA | 1 |
| 66 | 716835 | REPLANTEO Y TRAZADO (M09 - CARCAMO Y CASETA DE BOMBEO) | M2 | 19,08 |
| 67 | 716836 | EXCAVACION COMUN SUELO SEMIDURO 0-2 M (M09 - CARCAMO Y CASETA DE BOMBEO) | M3 | 7,06 |
| 68 | 716837 | EXCAVACION SUELO DURO 0-2 M (M09 - CARCAMO Y CASETA DE BOMBEO) | M3 | 14,9 |
| 69 | 716838 | PISO DE HORMIGON SIMPLE SOBRE EMPEDRADO (M09 - CARCAMO Y CASETA DE BOMBEO) | M2 | 24,5 |
| 70 | 716839 | CIMIENTOS DE HORMIGON CICLOPEO H18 50% P.D. (M09 - CARCAMO Y CASETA DE BOMBEO) | M3 | 7,06 |
| 71 | 716840 | SOBRECIMIENTOS DE HORMIGON CICLOPEO H18 50% P.D. (M09 - CARCAMO Y CASETA DE BOMBEO) | M3 | 2,27 |
| 72 | 716841 | VIGA CADENA DE HORMIGON ARMADO H21 (M09 - CARCAMO Y CASETA DE BOMBEO) | M3 | ,52 |
| 73 | 716842 | MURO DE LADRILLO DE 6H 24X10X15 (M09 - CARCAMO Y CASETA DE BOMBEO) | M2 | 36,97 |
| 74 | 716843 | VENTANA DE LADRILLO CELOSIA (M09 - CARCAMO Y CASETA DE BOMBEO) | M2 | 2,4 |
| 75 | 716844 | CUBIERTA DE CALAMINA ESTRUCTURA SIMPLE DE MADERA M09 - CARCAMO Y CASETA DE BOMBEO) | M2 | 22,8 |
| 76 | 716845 | PUERTA METALICA CASETA DE BOMBEO (M09 - CARCAMO Y CASETA DE BOMBEO) | M2 | 1,44 |
| 77 | 716846 | REVOQUE INTERIOR MUROS (M09 - CARCAMO Y CASETA DE BOMBEO) | M2 | 34,15 |
| 78 | 716847 | REVOQUE EXTERIOR MUROS (M09 - CARCAMO Y CASETA DE BOMBEO) | M2 | 36,97 |
| 79 | 716848 | PINTURA EXTERIOR LATEX (M09 - CARCAMO Y CASETA DE BOMBEO) | M2 | 36,97 |
| 80 | 716849 | PINTURA INTERIOR LATEX (M09 - CARCAMO Y CASETA DE BOMBEO) | M2 | 34,15 |
| 81 | 716850 | CERCO PERIMETRAL CON MALLA OLIMPICA CASETA DE BOMBEO (M09 - CARCAMO Y CASETA DE BOMBEO) | ML | 32 |
| 82 | 716851 | PROV. Y COLOC. BOMBAS EN SERIE 4 HP MAS ACCESORIOS (M09 - CARCAMO Y CASETA DE BOMBEO) | UND | 4 |
| 83 | 716852 | TABLERO AUTOMATICO DE CONTROL (M09 - CARCAMO Y CASETA DE BOMBEO) | GLB | 1 |
| 84 | 716853 | LOSAS DE HORMIGON ARMADO H21 (M09 - CARCAMO Y CASETA DE BOMBEO) | M3 | 3,43 |
| 85 | 716854 | MUROS DE HORMIGON ARMADO H21 (M09 - CARCAMO Y CASETA DE BOMBEO) | M3 | 4,16 |
| 86 | 716855 | REVOQUE INTERIOR IMPERMEABLE (M09 - CARCAMO Y CASETA DE BOMBEO) | M2 | 24,96 |
| 87 | 716856 | PROVISION Y COLOCADO DE ACCESORIOS CARCAMO (M09 - CARCAMO Y CASETA DE BOMBEO) | GLB | 1 |
| 88 | 716857 | TAPA METALICA E= 1/8 0.80 X 0.80 M (M09 - CARCAMO Y CASETA DE BOMBEO) | PZA | 1 |
| 89 | 716858 | TAPA METALICA E=1/8 0.70X0.70 (M09 - CARCAMO Y CASETA DE BOMBEO) | PZA | 1 |
| 90 | 716859 | REPLANTEO Y CONTROL DE LINEAS DE TUBERIA (M10 - LINEA DE IMPULSION) | ML | 344 |
| 91 | 716860 | EXCAVACION COMUN SUELO SEMIDURO 0-2 M (M10 - LINEA DE IMPULSION) | M3 | 51,6 |
| 92 | 716861 | RELLENO Y COMPACTADO CON MATERIAL CERNIDO (M10 - LINEA DE IMPULSION) | M3 | 15,48 |
| 93 | 716862 | RELLENO Y COMPACTADO CON MATERIAL COMUN (M10 - LINEA DE IMPULSION) | M3 | 36,12 |
| 94 | 716863 | PROVISION Y TENDIDO TUBERIA Fº Gº D= 2 1/2 (M10 - LINEA DE IMPULSION) | ML | 344 |
| 95 | 716864 | PRUEBA HIDRAULICA Y DESINFECCION TUBERIA 1 1/2 A 3 (M10 - LINEA DE IMPULSION) | ML | 344 |
| 96 | 716865 | REPLANTEO Y TRAZADO (M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | M2 | 53,29 |
| 97 | 716866 | EXCAVACION COMUN SUELO SEMIDURO 0-2 M (M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | M3 | 42,92 |
| 98 | 716867 | HORMIGON CICLOPEO FUNDACIONES H18 50% P.D. (M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | M3 | 17,2 |
| 99 | 716868 | HORMIGON CICLOPEO ELEVACIONES H18 50% P.D. (M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | M3 | 36,08 |
| 100 | 716869 | LOSA TAPA DE HORMIGON ARMADO H21 (M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | M3 | 3,08 |
| 101 | 716870 | LOSA DE FONDO HORMIGON ARMADO H21 (M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | M3 | 3,04 |
| 102 | 716871 | REVOQUE INTERIOR IMPERMEABLE (M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | M2 | 56,25 |
| 103 | 716872 | REVOQUE EXTERIOR CEMENTO (M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | M2 | 84,02 |
| 104 | 716873 | ACCESORIOS CAMARA DE LLAVES ENTRADA (M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | GLB | 1 |
| 105 | 716874 | ACC. CAMARA DE LLAVES SALIDA, LIMPIEZA Y REBOSE (M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | GLB | 1 |
| 106 | 716875 | ACCESORIOS VENTILACION DRENAJE Y SEGURO (M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | GLB | 1 |
| 107 | 716876 | TAPA METALICA E= 1/8 0.80 X 0.80 M (M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | PZA | 1 |
| 108 | 716877 | TAPA METALICA E=1/8 0.90X0.90 M (M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | PZA | 2 |
| 109 | 716878 | SOBRECIMIENTOS DE HORMIGON CICLOPEO H18 50% P.D. (M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | M3 | 1,54 |
| 110 | 716879 | CERCO PERIMETRAL CON MALLA OLIMPICA TANQUE DE ALMACENAMIENTO(M11 - TANQUE DE ALMACENAMIENTO HºCº 35 M4) | ML | 32 |
| 111 | 716880 | REPLANTEO Y CONTROL DE LINEAS DE TUBERIA (M12 - RED DE DISTRIBUCION) | ML | 2377,72 |
| 112 | 716881 | EXCAVACION COMUN SUELO SEMIDURO 0-2 M (M12 - RED DE DISTRIBUCION) | M3 | 570,65 |
| 113 | 716882 | RELLENO Y COMPACTADO CON MATERIAL COMUN (M12 - RED DE DISTRIBUCION) | M3 | 570,65 |
| 114 | 716883 | PROV. Y TEND. SUPERTUBO HDPE 25 MM (3/4) PN-16 (M12 - RED DE DISTRIBUCION) | ML | 857,92 |
| 115 | 716884 | PROV. Y TEND. SUPERTUBO HDPE 32 MM (1) PN-12.5 (M12 - RED DE DISTRIBUCION) | ML | 747,58 |
| 116 | 716885 | PROV. Y TENDIDO TUBERIA SUPERTUBO HDPE 50MM (1 1/2) PN-8 (M12 - RED DE DISTRIBUCION) | ML | 339,5 |
| 117 | 716886 | PROV. Y TEND. SUPERTUBO HDP 63 MM (2) PN-8 (M12 - RED DE DISTRIBUCION) | ML | 432,72 |
| 118 | 716887 | PRUEBA HIDRAULICA Y DESINFECCION TUBERIA 1 1/2 A 3 (M12 - RED DE DISTRIBUCION) | ML | 2377,72 |
| 119 | 716888 | PROV. Y COLOCADO ACCESORIOS RED DISTRIBUCION (M12 - RED DE DISTRIBUCION) | GLB | 1 |
| 120 | 716889 | EXCAVACION COMUN SUELO SEMIDURO 0-2 M (M13 - CONEXION DOMICILIARIA) | M3 | 202,22 |
| 121 | 716890 | SOLADO DE PIEDRA (E=0.20 M) (M13 - CONEXION DOMICILIARIA) | M2 | 64,05 |
| 122 | 716891 | HORMIGON CICLOPEO ELEVACIONES H18 50% P.D. (M13 - CONEXION DOMICILIARIA) | M3 | 10,75 |
| 123 | 716892 | HORMIGON ARMADO H21 PEDESTAL (M13 - CONEXION DOMICILIARIA) | M3 | 2,88 |
| 124 | 716893 | REVOQUE EXTERIOR CEMENTO (M13 - CONEXION DOMICILIARIA) | M2 | 214,11 |
| 125 | 716894 | CAMARA DE LLAVES TIPO C 0.40X0.15X0.26 (M13 - CONEXION DOMICILIARIA) | PZA | 122 |
| 126 | 716895 | PROV. Y TEND. SUPERTUBO HDPE 20 MM (1/2) PN-20 (M13 - CONEXION DOMICILIARIA) | ML | 1220 |
| 127 | 716896 | PROV. Y COLOC. ACC. INSTALACIONES DOMICILIARIAS + MEDIDOR DE AGUA (M13 - CONEXION DOMICILIARIA) | UND | 122 |
| 128 | 716897 | RELLENO Y COMPACTADO CON MATERIAL COMUN (M13 - CONEXION DOMICILIARIA) | M3 | 183 |
| 129 | 716898 | MURO DE LADRILLO DE 6H 24X10X15 (M14 - HIPOCLORADOR Y CASETA) | M2 | 5,6 |
| 130 | 716899 | CUBIERTA DE CALAMINA ESTRUCTURA SIMPLE DE MADERA (M14 - HIPOCLORADOR Y CASETA) | M2 | 1,9 |
| 131 | 716900 | REVOQUE INTERIOR MUROS (M14 - HIPOCLORADOR Y CASETA) | M2 | 5,6 |
| 132 | 716901 | REVOQUE EXTERIOR MUROS (M14 - HIPOCLORADOR Y CASETA) | M2 | 5,6 |
| 133 | 716902 | PINTURA EXTERIOR LATEX (M14 - HIPOCLORADOR Y CASETA) | M2 | 5,6 |
| 134 | 716903 | PUERTA METALICA CASETA (M14 - HIPOCLORADOR Y CASETA) | M2 | ,84 |
| 135 | 716904 | PROVISION E INSTALACION ACCESORIOS HIPOCLORADOR (M14 - HIPOCLORADOR Y CASETA) | GLB | 1 |
| 136 | 716905 | LETRINA FIJA CON ARRASTRE HIDRAULICO (M15 - MEDIDAS DE MITIGACION AMBIENTAL) | PZA | 1 |
| 137 | 716906 | LETRERO DE SEÑALIZACION AMBIENTAL (M15 - MEDIDAS DE MITIGACION AMBIENTAL) | PZA | 8 |
| 138 | 716907 | CONTENEDORES PARA BASURA (M15 - MEDIDAS DE MITIGACION AMBIENTAL) | PZA | 4 |
| 139 | 716908 | CINTAS DE SEÑALIZACION (M15 - MEDIDAS DE MITIGACION AMBIENTAL) | ML | 300 |
| 140 | 716909 | INST. PASO PEATONAL SIMPLE SOBRE ZANJA CON PASAMANOS (M15 - MEDIDAS DE MITIGACION AMBIENTAL) | PZA | 4 |
| 141 | 716910 | LIMPIEZA GENERAL DE LA OBRA (M15 - MEDIDAS DE MITIGACION AMBIENTAL) | GLB | 1 |
| 142 | 716911 | REPLANTEO Y TRAZADO DE OBRAS (M16 - MEDIDAS DE PROTEC. DE LA FUENTE DE AGUA) | ML | 39,1 |
| 143 | 716912 | EXCAVACION COMUN SUELO SEMIDURO 0-2 M (M16 - MEDIDAS DE PROTEC. DE LA FUENTE DE AGUA) | M3 | 11,74 |
| 144 | 716913 | HORMIGON CICLOPEO FUNDACIONES H18 50% P.D. (M16 - MEDIDAS DE PROTEC. DE LA FUENTE DE AGUA) | M3 | 3,95 |
| 145 | 716914 | HORMIGON CICLOPEO ELEVACIONES H18 50% P.D. (M16 - MEDIDAS DE PROTEC. DE LA FUENTE DE AGUA) | M3 | 7,2 |
| 146 | 716915 | CERCO PERIMETRAL CON MALLA OLIMPICA (OBRA DE TOMA 1) (M16 - MEDIDAS DE PROTEC. DE LA FUENTE DE AGUA) | ML | 8 |
| 147 | 716916 | CERCO PERIMETRAL CON MALLA OLIMPICA (OBRA DE TOMA 2) (M16 - MEDIDAS DE PROTEC. DE LA FUENTE DE AGUA) | ML | 9 |
| 148 | 716917 | PLANTINES PARA ARBORIZACION-FORESTACION (M17 - EFECTOS AL CAMBIO CLIMATICO) | UND | 300 |
| 149 | 716918 | EXCAVACION COMUN SUELO SEMIDURO 0-2 M (M17 - EFECTOS AL CAMBIO CLIMATICO) | M3 | 22,4 |
| 150 | 716919 | PROTECCION DE OBRAS CON GAVIONES (M17 - EFECTOS AL CAMBIO CLIMATICO) | M3 | 48 |
| 151 | 716920 | PLACA DE ENTREGA DE OBRA SEGUN DISEÑO (M17 - EFECTOS AL CAMBIO CLIMATICO) | PZA | 1 |