1 | 569726 | LETREROS DE SEÑALIZACION AMBIENTAL PROV. E INST. | PZA | 5 |
2 | 569728 | CINTA PLASTICA DE SEGURIDAD | ML | 1 |
3 | 569730 | CONTENEDOR DE RESIDUOS SOLIDOS PROV. Y COLOC. | PZA | 3 |
4 | 569731 | LETRINA MOVIL P/CAMPAMENTO | PZA | 1 |
5 | 569735 | REPLANTEO Y TRAZADO DE OBRAS OBRA DE TOMA | M2 | 5,32 |
6 | 569738 | EXCAVACION DE 0-2 M SUELO SEMIDURO OBRA DE TOMA | M3 | 10,79 |
7 | 569740 | HORMIGON H-5 PARA CAPA DE NIVELACION E=5 CM OBRA DE TOMA | M3 | 1,48 |
8 | 569744 | REVOQUE EXTERIOR DE CEMENTO OBRA DE TOMA | M2 | 33,41 |
9 | 569745 | FILTRO DE ARENA SELECCIONADA PROV. Y COLOC. | M3 | 5,54 |
10 | 569748 | RIP RAP E=30 CM PROV. Y COLOC. | M2 | 23,67 |
11 | 569749 | TAPA METALICA 60X60 CM E=1/8 SUMINISTRO E INSTALACION | PZA | 2 |
12 | 569754 | VALVULAS Y ACCS. PARA OBRA DE TOMA2 (S/DETALLE) SUM. E INST. | GLB | 1 |
13 | 569759 | REPLANTEO Y TRAZADO DE OBRAS PARA OBRA DE TOMA | M2 | 5,32 |
14 | 569761 | EXCAVACION DE 0-2 M SUELO SEMIDURO PARA OBRA DE TOMA | M3 | 9,29 |
15 | 569764 | HORMIGON CICLOPEO H-17 50% P.D.PARA OBRA DE TOMA | M3 | 10,11 |
16 | 569766 | HORMIGON ARMADO H-21 PARA ESTRUCTURAS PARA OBRA DE TOMA | M3 | ,37 |
17 | 569771 | VALVULAS Y ACCS. PARA OBRA DE TOMA2 (S/DETALLE) SUM. E INST. PARA OBRA DE TOMA | GLB | 1 |
18 | 569855 | MOVILIZACION E INSTALACION DE FAENAS | GLB | 1 |
19 | 569857 | LETRERO DE OBRA S/G DISEÑO | PZA | 1 |
20 | 569859 | PLACA DE ENTREGA DE OBRA S/G DISEÑO | PZA | 1 |
21 | 569860 | DESMOVILIZACION LIMPIEZA GENERAL Y RETIRO DE ESCOMBROS | GLB | 1 |
22 | 569861 | SEÑALIZACION INFORMATIVA SERVICIOS | PZA | 3 |
23 | 569863 | REPOSICION DE COBERTURA VEGETAL NATIVA | M2 | 60 |
24 | 569865 | ANALISIS FISICO QUIMICO Y BACTEOROLOGICO | PTO | 2 |
25 | 569866 | EXCAVACION DE 0-2 M SUELO SEMIDURO INFRAESTRUCTURA | M3 | 7,16 |
26 | 569867 | HORMIGON CICLOPEO H-17 50% P.D. | M3 | 4,5 |
27 | 569871 | HORMIGON CICLOPEO H-17 50% P.D. OBRA DE TOMA | M3 | 13,76 |
28 | 569872 | HORMIGON ARMADO H-21 PARA ESTRUCTURAS | M3 | ,29 |
29 | 569873 | REVOQUE INTERIOR IMPERMEABLE OBRA DE TOMA | M2 | 31,34 |
30 | 569876 | FILTRO CON MATERIAL GRANULAR PROV. Y COLOC. | M3 | 2,75 |
31 | 569878 | TAPA METALICA 80X100 CM E=1/8 SUMINISTRO E INSTALACION | PZA | 1 |
32 | 569881 | HORMIGON H-5 PARA CAPA DE NIVELACION E=5 CM PARA OBRA DE TOMA | M3 | ,27 |
33 | 569886 | REVOQUE INTERIOR IMPERMEABLE PARA OBRA DE TOMA | M2 | 18,19 |
34 | 569889 | REVOQUE EXTERIOR DE CEMENTO PARA OBRA DE TOMA | M2 | 17,26 |
35 | 569891 | FILTRO DE ARENA SELECCIONADA PROV. Y COLOC. PARA OBRA DE TOMA | M3 | ,92 |
36 | 569893 | FILTRO CON MATERIAL GRANULAR PROV. Y COLOC. PARA OBRA DE TOMA | M3 | 1,42 |
37 | 569894 | RIP RAP E=30 CM PROV. Y COLOC. PARA OBRA DE TOMA | M2 | 6,16 |
38 | 569896 | TAPA METALICA 60X60 CM E=1/8 SUMINISTRO E INSTALACION PARA OBRA DE TOMA | PZA | 2 |
39 | 569899 | TAPA METALICA 80X100 CM E=1/8 SUMINISTRO E INSTALACION PARA OBRA DE TOMA | PZA | 1 |
40 | 569902 | REPLANTEO Y TRAZADO DE TUBERIA | ML | 339,8 |
41 | 569905 | EXCAVACION DE 0-2 M SUELO SEMIDURO ADUCCION | M3 | 72 |
42 | 569908 | EXCAVACION EN ROCA | M3 | 6 |
43 | 569909 | TUBERIA PEAD DN 1 (32 MM) SDR 17 SUMINISTRO Y TENDIDO | ML | 339,8 |
44 | 569916 | VAL. Y ACCS. PARA ADUCCIÓN (S/DETALLE) SUM. E INST | GLB | 1 |
45 | 569918 | REPLANTEO Y TRAZADO DE TUBERIA PARA ADUCCION | ML | 654,49 |
46 | 569920 | EXCAVACION DE 0-2 M SUELO DURO PARA TUBERIA ADUCCION | M3 | 24 |
47 | 569921 | TUBERIA PEAD DN 1 (32 MM) SDR 17 SUMINISTRO Y TENDIDO ADUCCION | ML | 654,49 |
48 | 569922 | RELLENO Y APISONADO C/TIERRA CERNIDA ADUCCION | M3 | 83,92 |
49 | 569925 | RELLENO Y APISONADO C/TIERRA CERNIDA (INCL. PROV. MATERIAL) PARA ADUCCION | M3 | 20,8 |
50 | 569927 | VAL. Y ACCS. PARA ADUCCIÓN (S/DETALLE) SUM. E INST ADUCCION | GLB | 1 |
51 | 569934 | TUBERIA F.G. DN 2 PROV. E INST. PARA P.Q. 6 M | ML | 18 |
52 | 569935 | ABRAZADERAS METALICAS CON PERNOS DE ANCLAJE PROV. E INST. PARA P.Q. 6M | PZA | 36 |
53 | 569936 | ACCS. PARA CRUCE QUEBRADA TIPO 1 (S/DETALLE) PROV. E INST. P.Q. 6M | GLB | 1 |
54 | 569937 | REPLANTEO Y TRAZADO DE OBRAS PARA CAMARA LIMPIEZA | M2 | 1,21 |
55 | 569938 | EXCAVACION DE 0-2 M SUELO SEMIDURO PARA CAMARA LIMPIEZA | M3 | 2,88 |
56 | 569940 | TAPA METALICA 80X80 CM E=1/8 SUMINISTRO E INSTALACION | PZA | 1 |
57 | 569942 | VAL. Y ACC. PARA CAMARA DE PURGA (S/DETALLE) PROV. E INST. | GLB | 1 |
58 | 569945 | HORMIGON ARMADO H-21 PARA LOSA DE PISO | M3 | ,39 |
59 | 569946 | HORMIGON CICLOPEO H-17 50% P.D. TANQUE | M3 | 14,11 |
60 | 569948 | REVOQUE INTERIOR IMPERMEABLE | M2 | 18,05 |
61 | 569951 | TAPA METALICA 60X60 CM E=1/8 SUMINISTRO E INSTALACION PARA TANQUE | PZA | 1 |
62 | 569953 | EXCAVACION DE 0-2 M SUELO SEMIDURO CAMARAS | M3 | ,86 |
63 | 569956 | HORMIGON H-5 PARA CAPA DE NIVELACION E=5 CM CAMARAS | M3 | ,06 |
64 | 569957 | HORMIGON CICLOPEO H-17 50% P.D. CAMARAS | M3 | ,59 |
65 | 569958 | MATERIAL GRANULAR SIN SELECC. | M3 | ,03 |
66 | 569961 | VALVULAS Y ACCS. PARA TANQUE (S/DETALLE) SUM. E INST. | GLB | 1 |
67 | 569965 | CERCO DE MALLA OLIMPICA C/POSTE F.G. PROV. Y COLOC. | M2 | 58,52 |
68 | 569966 | PUERTA METALICA CON MALLA OLIMPICA | M2 | 1,76 |
69 | 569967 | REVOQUE EXTERIOR DE CEMENTO PARA CASETA | M2 | 9,39 |
70 | 569968 | VIGA DE MADERA 3X2 PROVISION Y COLOCADO | P2 | ,8 |
71 | 569969 | TABLONES DE MADERA 1 | P2 | 8,6 |
72 | 569972 | PUERTA METALICA CON MALLA OLIMPICAS | M2 | 2,16 |
73 | 569973 | TANQUE DE SOLUCION SUMINISTRO E INSTALACION | PZA | 2 |
74 | 569974 | EXCAVACION DE 0-2 M SUELO SEMIDURO DISTRIBUCION | M3 | 313,06 |
75 | 569975 | EXCAVACION DE 0-2 M SUELO DURO DISTRIBUCION | M3 | 48 |
76 | 569976 | EXCAVACION EN ROCA TUB. DISTRIBUCION | M3 | 24 |
77 | 569977 | TUBERIA PEAD DN 1 1/4 (40 MM) SDR17 SUMINISTROY TENDIDO | ML | 423,62 |
78 | 569978 | ACCESORIOS PARA RED DE DISTRIBUCION (S/DETALLE) PROV. E INST | GLB | 1 |
79 | 569979 | TAPA METALICA 50X50 CM E=1/8 SUMINISTRO E INSTALACION | PZA | 2 |
80 | 569980 | REVOQUE EXTERIOR DE CEMENTO PARA CAMARA | M2 | 4,48 |
81 | 569981 | MATERIAL GRANULAR SIN SELECC. PARA CAMARA | M3 | ,03 |
82 | 569982 | VAL. Y ACC. P/CAMARA DE PURGA (S/DETALLE) PROV. E INST. | GLB | 2 |
83 | 569983 | ENCAMISADO DE HORMIGON SIMPLE H21 PARA TUBERIAS | M3 | ,94 |
84 | 569984 | REPLANTEO Y TRAZADO DE OBRAS CRUCE QUEBRADA | M2 | 15 |
85 | 569985 | HORMIGON CICLOPEO H-17 50% P.D. CRUCE QUEBRADA | M3 | ,19 |
86 | 569986 | TUBERIA F.G. DN 2 PROV. E INST. | ML | 20 |
87 | 569987 | ACCS. PARA CRUCE QUEBRADA TIPO 1 (S/DETALLE) PROV. E INST. | GLB | 2 |
88 | 569988 | TUBERIA PEAD DN 1/2 (20 MM) SDR 17 SUMINISTRO Y TENDIDO | ML | 244,8 |
89 | 569989 | HORMIGON H-5 PARA CAPA DE NIVELACION E=5 CM DOMICILIARIAS | M3 | ,85 |
90 | 569990 | MICROMEDIDORES Y ACCS. PROV. E INSTALACION | PZA | 21 |
91 | 569991 | EXCAVACION DE 0-2 M SUELO SEMIDURO PARA POZO | M3 | 19 |
92 | 569992 | HORMIGON ARMADO H-21 PARA TAPA PARA POZO | M3 | ,84 |
93 | 569993 | POZO ABSORVENTE CON FILTRO | GLB | 21 |
94 | 570012 | EXCAVACION DE 0-2 M SUELO DURO | M3 | 24 |
95 | 570013 | PRUEBA HIDRAULICA P/AGUA POTABLE ADUCCION CHACARA | ML | 339,8 |
96 | 570015 | RELLENO Y APISONADO C/TIERRA CERNIDA | M3 | 51,77 |
97 | 570016 | RELLENO Y APISONADO C/TIERRA CERNIDA (INCL. PROV. MATERIAL) | M3 | 3,2 |
98 | 570017 | RELLENO Y COMPACTADO S/MAT. SELEC. HASTA TERR. NATURAL | M3 | 47,57 |
99 | 570019 | EXCAVACION DE 0-2 M SUELO SEMIDURO PARA TUBERIA | M3 | 136,35 |
100 | 570022 | EXCAVACION EN ROCA TUB. ADUCCION | M3 | 39 |
101 | 570024 | PRUEBA HIDRAULICA P/AGUA POTABLE | ML | 654,49 |
102 | 570028 | RELLENO Y COMPACTADO S/MAT. SELEC. HASTA TERR. NATURAL ADUCCION | M3 | 91,63 |
103 | 570032 | REPLANTEO Y TRAZADO DE OBRAS PARA P.Q. 6 M | M2 | 5,4 |
104 | 570033 | EXCAVACION DE 0-2 M SUELO SEMIDURO PARA P.Q. 6 M | M3 | 7,44 |
105 | 570036 | HORMIGON CICLOPEO H-17 50% P.D. PARA P.Q. 6 M | M3 | ,1 |
106 | 570039 | HORMIGON CICLOPEO H-17 50% P.D. PARA CAMARA LIMPIEZA | M3 | ,64 |
107 | 570042 | REVOQUE EXTERIOR DE CEMENTO PARA CAMARA LIMPIEZA | M2 | 4,18 |
108 | 570043 | MATERIAL GRANULAR SIN SELECC. CAMARA LIMPIEZA | M3 | ,1 |
109 | 570046 | ENCAMISADO DE HORMIGON SIMPLE H21 PARA TUBERIAS PROTECCION | M3 | 2,25 |
110 | 570049 | REPLANTEO Y TRAZADO DE OBRAS | M2 | 44,89 |
111 | 570050 | EXCAVACION DE 0-2 M SUELO SEMIDURO TANQUE | M2 | 16,01 |
112 | 570051 | HORMIGON H-5 PARA CAPA DE NIVELACION E=5 CM | M3 | ,73 |
113 | 570054 | SOLADURA DE PIEDRA E=0.20 M | M2 | 2,25 |
114 | 570120 | HORMIGON ARMADO H-21 PARA LOSA DE CUBIERTA | M3 | ,39 |
115 | 570124 | REVOQUE EXTERIOR DE CEMENTO | M2 | 35,99 |
116 | 570125 | PINTURA EXTERIOR LATEX C/DISEÑO | M2 | 35,99 |
117 | 570127 | PRUEBA HIDRAULICA Y DESINFECCION DEL TANQUE | M3 | 5 |
118 | 570130 | REPLANTEO Y TRAZADO DE OBRAS CAMARAS | M2 | ,86 |
119 | 570133 | TAPA METALICA 60X60 CM E=1/8 SUMINISTRO E INSTALACION CAMARAS | PZA | 2 |
120 | 570134 | EXCAVACION DE 0-2 M SUELO SEMIDURO CERCO | M3 | 7,98 |
121 | 570136 | HORMIGON CICLOPEO H-17 80% P.D. PARA CIMIENTOS | M3 | 7,98 |
122 | 570138 | HORMIGON CICLOPEO H-17 50% P.D. PARA SOBRECIMIENTOS | M3 | 1,6 |
123 | 570141 | MURO DE LADRILLO 6 HUECOS E=12 CM | M2 | 9,39 |
124 | 570142 | CUBIERTA DE CALAMINA GALVANIZADA N°28 INCL. MADERAMEN | M2 | 3,36 |
125 | 570143 | DOSIFICADOR DE 20 L. PROVISION E INSTALACION | PZA | 2 |
126 | 570144 | VALVULAS Y ACC. PARA HIPOCLORADOR (S/DETALLE) SUM. E INST. | GLB | 2 |
127 | 570145 | REPLANTEO Y TRAZADO DE TUBERIA DISTRIBUCION | ML | 963,52 |
128 | 570146 | TUBERIA PEAD DN 1 (32 MM) SDR 17 SUMINISTRO Y TENDIDO DISTRIBUCION | ML | 539,9 |
129 | 570147 | RELLENO Y APISONADO C/TIERRA CERNIDA DISTRIBUCION | M3 | 154,16 |
130 | 570148 | RELLENO Y COMPACTADO S/MAT. SELEC. HASTA TERR. NATURAL DISTRIBUCION | M3 | 134,89 |
131 | 570149 | PRUEBA HIDRAULICA P/AGUA POTABLE RED DISTRIBUCION | ML | 963,52 |
132 | 570150 | REPLANTEO Y TRAZADO DE OBRAS PARA CAMARA | M2 | 1,28 |
133 | 570151 | EXCAVACION DE 0-2 M SUELO SEMIDURO PARA CAMARA | M3 | 2,47 |
134 | 570152 | HORMIGON CICLOPEO H-17 50% P.D. PARA CAMARA | M3 | ,59 |
135 | 570153 | EXCAVACION DE 0-2 M SUELO SEMIDURO CRUCE QUEBRADA | M3 | 8,48 |
136 | 570154 | ABRAZADERAS METALICAS CON PERNOS DE ANCLAJE PROV. E INST. | PZA | 8 |
137 | 570155 | REPLANTEO Y TRAZADO DE TUBERIA DOMICILIARIAS | ML | 244,8 |
138 | 570156 | EXCAVACION DE 0-2 M SUELO SEMIDURO DOMICILIARIAS | M3 | 63,73 |
139 | 570157 | RELLENO Y APISONADO C/TIERRA CERNIDA DOMICILIARIAS | M3 | 39,17 |
140 | 570158 | RELLENO Y COMPACTADO S/MAT. SELEC. HASTA TERR. NATURAL CONEXIÓN DOMICILIARIA | M3 | 19,58 |
141 | 570159 | HORMIGON CICLOPEO H-17 50% P.D. DOMICILIARIAS | M3 | 4,76 |
142 | 570160 | SOLADURA DE PIEDRA E=0.20 M DOMICILIARIAS | M2 | 3,36 |
143 | 570161 | HORMIGON ARMADO H-21 PARA TAPA | M3 | ,21 |
144 | 570162 | VALV. Y ACCS. PARA PILETA DOM. (S/DETALLE) PROV. E INST. | GLB | 21 |
145 | 570163 | MAMPOSTERIA DE PIEDRA | M3 | 6,6 |
146 | 570164 | HORMIGON CICLOPEO H-17 50% P.D. PARA POZO | M3 | 3,66 |