1 | 15465 | M01 - ACTIVIDADES INICIALES | UM | 0 |
2 | 15466 | INSTALACION DE FAENAS-A.I. | glb | 1 |
3 | 15467 | LETRERO DE OBRA-A.I. | pza | 1 |
4 | 15468 | M02 - RED DE IMPULSION | UM | 0 |
5 | 15469 | REPLANTEO Y TRAZADO DE TUBERIAS-R.I. | m | 850 |
6 | 15470 | PROV.TENDI.TUB, PVC E40 D= 1 1/2 PULG-R.I. | m | 850 |
7 | 15471 | EXCAVACION DE 0-2 M SUELO SEMIDURO-R.I. | m³ | 0 |
8 | 15472 | CAMA DE TIERRA COMUN CERNIDA-R.I. | m³ | 0 |
9 | 15493 | RELLENO COMPACTADO MANUAL CON MATERIAL SELECCIONADO-R.I. | m³ | 0 |
10 | 15494 | RELLENO COMPACTADO MANUAL CON MATERIAL COMUN-R.I. | m³ | 0 |
11 | 15495 | PRUEBA HIDRAULICA-R.I. | m | 850 |
12 | 15496 | M03 - PILETAS DOMICILIARIAS | UM | 0 |
13 | 15497 | PROV. Y COLOC. DE ACCESORIOS PARA PILETAS + MEDIDOR-P.D. | pza | 2 |
14 | 15498 | EXCAVACION DE 0-2 M S/ SEMIDURO (ESTRUCTURAS)-P.D. | m³ | ,63 |
15 | 15499 | HORMIGON ARMADO H-21 ESTRUCTURAS-P.D. | m³ | ,08 |
16 | 15500 | ZAMPEADO DE PIEDRA MAS EMBOQUILLADO-P.D. | m² | 1,21 |
17 | 15501 | HORMIGÓN CICLOPEO H-18 (50% P.D.)-P.D. | m³ | ,21 |
18 | 15502 | REVOQUE INTERIOR/ EXTERIOR CON MORTERO-P.D. | m² | 11,63 |
19 | 15503 | PINTURA INTERIOR/ EXTERIOR LATEX-P.D. | m² | 93,07 |
20 | 15504 | PROV.TENDI.TUB, PVC E40 D= 1/2 PULG-P.D. | m | 120 |
21 | 15505 | M04 - TANQUE SEMIENTERRADO DE ALMACENAMIENTO | UM | 0 |
22 | 15506 | EXCAVACION DE 0-2 M S/ SEMIDURO (ESTRUCTURAS)-T.S.A. | m³ | 33,93 |
23 | 15507 | SOLADURA DE PIEDRA-T.S.A. | m² | 12,25 |
24 | 15508 | HORMIGON POBRE PISO E=5 CM-T.S.A. | m² | 12,25 |
25 | 15509 | HORMIGON ARMADO H-21 ESTRUCTURAS-T.S.A. | m³ | 9,37 |
26 | 15510 | HORMIGÓN CICLOPEO H-18 (50% P.D.)-T.S.A. | m³ | 1,16 |
27 | 15511 | REVOQUE INTERIOR/ EXTERIOR CON MORTERO-T.S.A. | m² | 43,64 |
28 | 15512 | REVOQUE DE INTERIOR IMPERMEABLE CON MORTERO-T.S.A. | m² | 34,2 |
29 | 15513 | PROV. Y COLOCADO DE ACCESORIOS CÁMARA DE LLAVES-T.S.A. | glb | 1 |
30 | 15514 | PROV. Y COL. DE ACCESORIOS VENTILACION Y ENTRADA TANQUE-T.S.A. | glb | 1 |
31 | 15515 | PROV. Y COLOCADO DE TAPA METÁLICA E= 1/8 0.80X0.80-T.S.A. | pza | 1 |
32 | 15516 | PROV. Y COLOCADO DE TAPA METÁLICA E= 1/8 0.65X0.65-T.S.A. | pza | 1 |
33 | 15517 | RELLENO COMPACTADO CON EQUIPO DE MATERIAL COMUN-T.S.A. | m³ | 22,25 |
34 | 15518 | PINTURA INTERIOR/ EXTERIOR LATEX-T.S.A. | m² | 57,8 |
35 | 15519 | PINTURA IMPERMEABILIZANTE-T.S.A. | m² | 57,8 |
36 | 15520 | M05 - CAMARAS DE DISTRIBUCION | UM | 0 |
37 | 15521 | EXCAVACION DE 0-2 M S/ SEMIDURO (ESTRUCTURAS)-C.D. | m³ | 2 |
38 | 15522 | HORMIGÓN CICLOPEO H-18 (50% P.D.)-C.D. | m³ | ,8 |
39 | 15523 | REVOQUE INTERIOR/ EXTERIOR CON MORTERO-C.D. | m² | 11,96 |
40 | 15524 | PROV. Y COLOCADO DE TAPA METÁLICA E= 1/8 0.65X0.65-C.D. | pza | 4 |
41 | 15525 | SOLADURA DE PIEDRA-C.D. | m² | 2,56 |
42 | 15526 | PROV. Y COLOCADO DE ACCESORIOS CÁMARA DE DISTRIBUCION TIPO I-C.D. | pza | 2 |
43 | 15527 | PROV. Y COLOCADO DE ACCESORIOS CÁMARA DE DISTRIBUCION TIPO II-C.D. | pza | 1 |
44 | 15528 | PROV. Y COLOCADO DE ACCESORIOS VALVULA REDUCTORA DE PRESION D= 1 -C.D. | glb | 1 |
45 | 15529 | M06 - CAMARA DE LIMPIEZA | UM | 0 |
46 | 15530 | EXCAVACION DE 0-2 M S/ SEMIDURO (ESTRUCTURAS)-C.L. | m³ | ,5 |
47 | 15531 | HORMIGÓN CICLOPEO H-18 (50% P.D.)-C.L. | m³ | ,2 |
48 | 15532 | REVOQUE INTERIOR/ EXTERIOR CON MORTERO-C.L. | m² | 2,99 |
49 | 15533 | PROV. Y COLOCADO DE TAPA METÁLICA E= 1/8 0.65X0.65-C.L. | pza | 1 |
50 | 15534 | SOLADURA DE PIEDRA-C.L. | m² | ,64 |
51 | 15535 | PROV. Y COLOCADO DE ACCESORIOS CÁMARA DE LIMPIEZA-C.L. | glb | 1 |
52 | 15536 | M07 - CERCO DE MALLA OLIMPICA | UM | 0 |
53 | 15537 | EXCAVACION DE 0-2 M S/ SEMIDURO (ESTRUCTURAS)-C.M.O. | m³ | 3,58 |
54 | 15538 | CIMIENTOS DE HORMIGÓN CICLOPEO H-18 (50% P.D.)-C.M.O. | m³ | 3,58 |
55 | 15539 | SOBRECIMIENTOS DE HORMIGÓN CICLOPEO H-18 (50% P.D.)-C.M.O. | m³ | 1,69 |
56 | 15540 | PROV. Y COLOC. DE MALLA OLIMPICA Y TUBOS FG 2 c/2,5 m-C.M.O. | m² | 42,2 |
57 | 15541 | PUERTA DE MALLA OLIMPICA (2,30*1,30 m)-C.M.O. | pza | 1 |
58 | 15542 | M08 - SISTEMA DE BOMBEO | UM | 0 |
59 | 15543 | PROV. Y COLOC. TABLERO AUTOMATICO CONTROL CON CABLEADO-S.B. | glb | 1 |
60 | 15544 | PROV. COLC. DE TOMACORRIENTES DOBLE-S.B. | pto | 4 |
61 | 15545 | PROV. Y COLOC. TABLERO DE DISTRIBUCION + DISYUNTOR TERMOMAGNETICO 30 A-S.B. | pza | 1 |
62 | 15546 | TENDIDO DE LINEA AWG 10 CON ACCESORIOS-S.B. | m | 20 |
63 | 15547 | PROV. INSTALACION TRANSFORMADOR MONOFASICO DE 25 kva en 14.4 kv-S.B. | pza | 1 |
64 | 15548 | AUTOMATIZACION SISTEMA DE BOMBEO-S.B. | glb | 1 |
65 | 15549 | M09 - CASETA DE BOMBEO | UM | 0 |
66 | 15550 | PROV. Y COLOCADO PUERTA METALICA TIPO REJA-C.B. | pza | 1 |
67 | 15551 | REVOQUE DE INTERIOR IMPERMEABLE CON MORTERO-C.B. | m² | 22,95 |
68 | 15552 | PROV Y COL. LUMINARI LED (ACCESORIOS Y CABLEADO)-C.B. | pto | 1 |
69 | 15553 | PROV. Y COLOCADO DE HIPOCLORADOR ELECTRICO + ACCESORIOS-C.B. | glb | 1 |
70 | 15554 | M10 - LIMPIEZA GENERAL | UM | 0 |
71 | 15555 | LIMPIEZA GENERAL Y RETIRO DE ESCOMBROS-L.G. | glb | 1 |
72 | 15556 | PLAQUETA DE ENTREGA DE OBRA SEGUN DISEÑO-L.G. | pza | 1 |