1 | 55571 | INSTALACION DE FAENAS | GLB | 1 |
2 | 55572 | LETRERO DE OBRAS S/DISEÑO | PZA | 1 |
3 | 55573 | PLACA ENTREGA DE OBRA 50X70CM (SEGUN DISEÑO) | PZA | 1 |
4 | 55574 | LIMPIEZA GENERAL | GLB | 1 |
5 | 55575 | REPLANTEO EN BAJA TENSION | M | 346,7 |
6 | 55576 | EXCAVACION DE HOYOS SUELO DURO | PTO | 4 |
7 | 55577 | RETIRO DE ESTRUCTURA R1-PH | PZA | 6 |
8 | 55578 | MONTAJE ESTRUCTURA R5-PH | PZA | 6 |
9 | 55579 | CONECTOR AISLADO BIMETALICO NILED P-120 | PZA | 10 |
10 | 55580 | INSTALACION PUESTA A TIERRA VM2-11 BT | PZA | 2 |
11 | 55581 | INSTALACION DE RIENDA SIMPLE VE1-1 BT | PZA | 4 |
12 | 55582 | INSTALACION ANCLA F2-1 BT | PZA | 4 |
13 | 55583 | CABLEADO Y FLECHADO CONDUCTOR CUADRUPLEX ASCR 2 AWG | KM | ,36 |
14 | 55584 | PROTECCION BT 3F P/TRANSFORMADOR TRIFASICO | PZA | 1 |
15 | 55585 | REPLANTEO Y TRAZADO | M² | 107,17 |
16 | 55586 | EXCAVACION (0-2 M) SUELO SEMIDURO | M³ | 149,2 |
17 | 55587 | HºCº FUNDACIONES TIPO B 50% P.D. | M³ | 15,4 |
18 | 55588 | HºCº ELEVACIONES TIPO B 50% P.D. | M³ | 11,21 |
19 | 55589 | MURO DE LADRILLO 6 HUECOS | M² | 26,08 |
20 | 55590 | VIGA CADENA DE Hº Aº | M³ | ,45 |
21 | 55591 | CUBIERTA CALAMINA GALV. Nº 28 | M² | 15,12 |
22 | 55592 | PISO CEMENTO + EMPEDRADO E=7.5CM + CARPETA Y OCRE | M² | 8,91 |
23 | 55593 | ACERA DE CEMENTO + EMPEDRADO E=7.5CM | M² | 12,64 |
24 | 55594 | PUERTA METÁLICA C/MALLA OLIMPICA F.G. Ø 2 | M² | 3,61 |
25 | 55595 | VENTANA METALICA C/MALLA OLIMPICA | M² | 2,4 |
26 | 55596 | REVOQUE INTERIOR DE YESO S/MURO DE LADRILLO | M² | 27,44 |
27 | 55597 | REVOQUE EXTERIOR DE CEMENTO S/MURO LADRILLO | M² | 30,73 |
28 | 55598 | PINTURA LATEX EXTERIOR | M² | 99,86 |
29 | 55599 | ACCESORIOS BOMBA SUMERGIBLE I=4; S=3 FG/HDPE | GLB | 1 |
30 | 55600 | PROV E INST BOMBA SUMERGIBLE TRIFASICA DE 7.5 - 15 HP | PZA | 1 |
31 | 55601 | PROV E INST ELECTRICA P/BOMBA SUMERGIBLE + TABLERO | GLB | 1 |
32 | 55602 | DEMOLICION HºC° | M³ | ,43 |
33 | 55603 | REVOQUE Y ENLUCIDO C/SIKA (E=2.5CM.) | M² | 191,8 |
34 | 55604 | PROV Y COLOCADO REJA METALICA FG D=2 C/2.54CM | M² | ,8 |
35 | 55605 | ZAMPEADO DE PIEDRA | M² | 81,19 |
36 | 55606 | LOSA BASE DE HºAº | M³ | 18,4 |
37 | 55607 | MURO DE HºAº | M³ | 27,29 |
38 | 55608 | LOSA TAPA DE HºAº | M³ | 2,9 |
39 | 55609 | REVOQUE DE CEMENTO S/MURO DE Hº | M² | 142,75 |
40 | 55610 | ACCESORIOS CARCAMO D=4 BRIDADOS + TAP/MET | GLB | 1 |
41 | 55611 | REPLANTEO Y CONTROL LINEAS DE TUBERIA | M | 3079,89 |
42 | 55612 | EXCAVACION DE ZANJA (0-1.5 M) SUELO SEMIDURO | M³ | 736,77 |
43 | 55613 | RELLENO Y COMP. C/MAQUINARIA C/TIERRA CERNIDA | M³ | 245,59 |
44 | 55614 | PROV. Y TEND. TUB. SUPERTUBO HDPE D=90MM PN-10 | M | 430,79 |
45 | 55615 | PROV. Y TEND. TUB. SUPERTUBO HDPE D=90MM PN-8 | M | 1528 |
46 | 55616 | RELLENO Y COMP. C/MAQUINARIA C/TIERRA COMUN | M³ | 581,18 |
47 | 55617 | PRUEBA HIDRAULICA (HASTA D=4) | M | 3079,89 |
48 | 55618 | ACCESORIOS TANQUE I=3 ; S=3 BRIDADOS + TAP/MET | GLB | 1 |
49 | 55619 | PROV. Y TEND. TUB. SUPERTUBO HDPE D=63MM PN-8 | M | 821,55 |
50 | 55620 | PROV. Y TEND. TUB. SUPERTUBO HDPE D=50MM PN-8 | M | 299,55 |
51 | 55621 | REPLANTEO DE MURO DE CERCO PERIMETRAL | M | 43,1 |
52 | 55622 | ACERA DE CEMENTO + EMPEDRADO E=5CM TIPO B | M² | 53,51 |
53 | 55623 | CERCO MALLA OLIMPICA FG D=2 + ALAMBRE DE PUAS 3 HILERAS | M² | 83,8 |
54 | 55624 | ASIENTO DE GRAVA E=10 CM | M³ | ,97 |
55 | 55625 | PTE PASARELA L=10M +/- 2M CELOSIA METALICA HDPE D=3 | PZA | 1 |
56 | 55626 | PROV. Y COLOC ACC. CAMARA DE PURGA FG 3-3-3 + TAP/MET | PZA | 1 |
57 | 55627 | PROV. Y COLOC. ACC. CAMARA VENTOSA 3 + TAP/MET | PZA | 1 |
58 | 55628 | PROV. Y COLOC ACC. CAMARA DE PURGA FG 2-2-2 + TAP/MET | PZA | 1 |
59 | 55629 | PROV. Y COLOC. ACC. CAMARA VENTOSA 2 + TAP/MET | PZA | 1 |
60 | 55630 | PROV. Y COLOC. ACC. CAMARA DE DERIVACION FG 3- 3- 3 + TAP/MET | PZA | 1 |
61 | 55631 | PROV. Y COLOC. ACC. CAMARA DE DERIVACION FG 3- 3- 2 + TAP/MET | PZA | 1 |
62 | 55632 | PROV. Y COLOC. ACC. CAMARA VALVULA ANTIRETORNO 3 + TAP/MET | PZA | 1 |
63 | 55633 | C. HIDRANTE SIMPLE HºCº D=1.5 + ACC. FG/HDPE + TAP/MET | PZA | 22 |
64 | 55634 | PROV. Y COLOC. ASPERSOR DE 3/4 2L METALICO INCL/PEDESTAL | PZA | 9 |
65 | 55635 | LIMPIEZA Y DESBROCE | GLB | 1 |
66 | 55636 | REFORESTACION CON PLANTINES + PROTECCION (ESPECIE GRANDE) | PZA | 700 |
67 | 55637 | REFORESTACION CON PLANTINES + PROTECCION (ESPECIE PEQUEÑA) | PZA | 700 |
68 | 55638 | EXCAVACION CON MAQUINARIA SUELO ALUVIAL | M³ | 135 |
69 | 55639 | PROV. Y COLOC. DE COLCHONETA 4X2X0.3 | M³ | 36 |
70 | 55640 | PROVISIÓN Y COLOCADO DE GAVION 2X1X1 | M³ | 300 |
71 | 55641 | LETREROS DE SEÑALIZACION AMBIENTAL, RESTRICTIVA Y PREVENTIVA | PZA | 8 |
72 | 55642 | CONTENEDOR DE RESIDUOS SOLIDOS V=120 LT | PZA | 8 |
73 | 55643 | CINTA PLASTICA DE SEGURIDAD | M | 1000 |
74 | 55644 | PASOS PEATONALES P/ZANJAS CON PASA MANOS FG | PZA | 2 |