| 1 | 1010459 | M01 INSTALACION DE FAENAS | glb. | 1 |
| 2 | 1010460 | M01 REPLANTEO TRAZADO Y CONTROL | m² | 15136,47 |
| 3 | 1010461 | M02 RETIRO DE ENLOSETADO HEXAGONAL C/CARGUIO | m² | 1759,15 |
| 4 | 1010462 | M02 MOVIMIENTO DE TIERRAS CON MAQUINARIA | m³ | 13190,81 |
| 5 | 1010463 | M02 CONFORMACION SUBRASANTE C/PEDRAPLEN C/PROV. | m³ | 2969,15 |
| 6 | 1010464 | M02 *CAPA SUB-BASE EST. GRANULOMETRICAMENTE E=25 CM | m³ | 3711,44 |
| 7 | 1010465 | M02 *COLOC. Y COMPACTADO CAPA SUB-RASANTE CON MATERIAL SELECCIONADO | m³ | 3769,58 |
| 8 | 1010466 | M02 *ADOQUINADO DOBLE S C/CAMA Y REJUNTE E=10CM VIAS VEHICULARES | m² | 13268,94 |
| 9 | 1010467 | M02 ADOQUINADO DOBLE S C/CAMA Y REJUNTE E=10 CM PASAJE PEATONAL | m² | 261,32 |
| 10 | 1010468 | M02 CORDON DE CIERRE Ho So DE 15x20x55 CM. | ml | 63,52 |
| 11 | 1010469 | M02 CUNETA PLUVIAL DE HORMIGÓN H21 | ml | 4015,51 |
| 12 | 1010470 | M02 EXCAVACIÓN 0-1 M. SUELO SEMIDURO | m³ | 229,75 |
| 13 | 1010471 | M02 CORDON DE ACERA Ho So DE 15x20x50 CM. | ml | 1368,52 |
| 14 | 1010472 | M02 PISO DE CEMENTO ACERAS E=5 CM. INCLUYE SOLADO | m² | 928,98 |
| 15 | 1010473 | M03 RETIRO DE ENLOSETADO DOBLE S C/CARGUIO | m² | 42 |
| 16 | 1010474 | M03 REPLANTEO Y TRAZADO DE TUBERIAS | ml | 103,08 |
| 17 | 1010475 | M03 EXCAVACION DE ZANJAS (0-2M.) SUELO SEMIDURO C-MAQUI. | m³ | 86,59 |
| 18 | 1010476 | M03 COLOCACION CAMA ASIENTO PARA TUBERIA | m³ | 14,43 |
| 19 | 1010477 | M03 PROV/TENDIDO TUBERIAS PVC SDR-41 D=6" | m | 43,08 |
| 20 | 1010478 | M03 PROV/TENDIDO TUBERIAS PVC SDR-41 D=8" | m | 60 |
| 21 | 1010479 | M03 RELLENO TIERRA CERNIDA COMPACTADA | m³ | 28,86 |
| 22 | 1010480 | M03 RELLENO COMUN DE ZANJAS SIN MAT. DE PRESTAMO | m³ | 32,47 |
| 23 | 1010481 | M03 CAMARA DE INSPECCION (H<=1.5M) INC. TAPA FºFº | pza | 2 |
| 24 | 1010482 | M03 SUMIDEROS PLUVIALES DE FoFo | pza | 6 |
| 25 | 1010483 | M03 REPOSICION DE LOSETAS + CAMA DE ARENA | m² | 42 |
| 26 | 1010484 | M04 RETIRO DE ESCOMBROS C/CARGUIO | m³ | 222,78 |
| 27 | 1010485 | M04 LIMPIEZA GENERAL DE LA OBRA | m² | 15136,47 |
| 28 | 1010486 | M05 HUMEDECIMIENTO DE SUELO | m² | 15136,47 |
| 29 | 1010487 | M05 DELIMITACION DE AREAS | ML | 6061,76 |
| 30 | 1010488 | M05 LETREROS DE SEÑALIZACION AMBIENTAL | PZA | 2 |
| 31 | 1010489 | M05 SEÑALIZACION VERTICAL INFORMATIVA | PZA | 2 |
| 32 | 1010490 | M05 CONTENEDORES DIFERENCIADOS | PZA | 2 |
| 33 | 1010491 | M05 CONTENEDORES DIFERENCIADOS DE ACOPIO | PZA | 2 |
| 34 | 1010492 | M05 FORESTACION ARBOLES | PZA | 35 |