| 1 | 705856 | MOVILIZACION DE OBRA 1 DE MAYO A HUASA HIGUERANI | GLB | 1 |
| 2 | 705857 | DERECHO DE COBRO POR OCUPAR TEMPORALMENTE UN BIEN MUNICIPAL PUBLICO | M | 933,37 |
| 3 | 705858 | EXCAVACION TERRENO SEMIDURO H= 0 - 2 M | M³ | 382,92 |
| 4 | 705859 | EXCAVACION TERRENO DURO H= 0 - 2 M | M³ | 1039,35 |
| 5 | 705860 | CAMA DE APOYO (MATERIAL DE PRESTAMO FINO) | M³ | 74,31 |
| 6 | 705861 | RELLENO SELECCIONADO Y COPACTADO | M³ | 404,44 |
| 7 | 705862 | RELLENO SIMPLE Y COMPACTADO CON MATERIAL COMUN | M³ | 741,91 |
| 8 | 705863 | PROV. Y COLOC. DE CINTA PREVENTIVA PARA TUBERIAS | M | 933,37 |
| 9 | 705864 | REPLANTEO PARA AGUA POTABLE | M | 933,37 |
| 10 | 705865 | PROVISION TUBERIA C30 C-E FFD D=600MM | M | 915,43 |
| 11 | 705866 | PROVISION TUBERIA C30 C-E FFD D=100MM | M | 17,94 |
| 12 | 705867 | PRUEBA HIDRAULICA PARA TUBERIAS DE AGUA POTABLE DE DN 50MM A 110MM | M | 17,94 |
| 13 | 705868 | PRUEBA HIDRAULICA PARA TUBERIAS DE AGUA POTABLE DE DN 450MM A 600MM | M | 915,43 |
| 14 | 705869 | INSTALACION TUBERIA FFD DE AGUA POTABLE DN=50 A 100MM | M | 17,94 |
| 15 | 705870 | INSTALACION TUBERIA FFD DE AGUA POTABLE DN=600 A 700MM | M | 915,43 |
| 16 | 705871 | PROVISION ACCESORIOS 1ER DE MAYO A HUESA HIGUERANI | GLB | 1 |
| 17 | 705872 | INSTALACION ACCESORIOS 1ER DE MAYO A HUESA HIGUERANI | GLB | 1 |
| 18 | 705873 | PROVISION VENTOSAS AIRE CARCAMO 1 MAYO A TANQUE H HIGUERANI C30 DN150 | GLB | 1 |
| 19 | 705874 | INSTALACION VENTOSAS AIRE CARCAMO 1 MAYO A TANQUE H HIGUERANI C30 DN150 | GLB | 1 |
| 20 | 705875 | PROVISION VENTOSAS AIRE CARCAMO 1 MAYO A TANQUE H HIGUERANI C30 DN100 | GLB | 1 |
| 21 | 705876 | INSTALACION VENTOSAS AIRE CARCAMO 1 MAYO A TANQUE H HIGUERANI C30 DN100 | GLB | 1 |
| 22 | 705877 | PROVISION VENTOSAS AIRE CARCAMO 1 MAYO A TANQUE HHIGUERANI C30 DN80 | GLB | 1 |
| 23 | 705878 | INSTALACION VENTOSAS AIRE CARCAMO 1 MAYO A TANQUE HHIGUERANI C30 DN80 | GLB | 1 |
| 24 | 705879 | PROVICION DESFOGUE CARCAMO 1RO DE MAYO A TANQUE HUASA HIGUERANI PN25 DN200 | GLB | 1 |
| 25 | 705880 | INSTALACION DESFOGUE CARCAMO 1RO DE MAYO A TANQUE HUASA HIGUERANI PN25 DN200 | GLB | 1 |
| 26 | 705881 | PROVISION DESFOGUE CARCAMO 1RO DE MAYO A TANQUE HUASA HIGUERANI PN16 DN200 | GLB | 1 |
| 27 | 705882 | INSTALACION DESFOGUE CARCAMO 1RO DE MAYO A TANQUE HUASA HIGUERANI PN16 DN200 | GLB | 1 |
| 28 | 705883 | PROV. E INST. CAMARA DE VALVULA DE H°A° H=1.5-2M PARA DN<300MM | PZA | 5 |
| 29 | 705884 | ANCLAJES DE HORMIGON CICLOPEO R180 | M3 | 10,24 |
| 30 | 705885 | REPOSICION EMPEDRADO SIN MATERIAL | M² | 240 |
| 31 | 705886 | LIMPIEZA Y RETIRO DE ESCOMBROS | M³ | 258,97 |
| 32 | 705887 | MOVILIZACION DE OBRA HUASA HIGUERANI A LOS ANGELES. | GLB | 1 |
| 33 | 705888 | DERECHO DE COBRO POR OCUPAR TEMPORALMENTE UN BIEN MUNICIPAL PUBLICO. | M | 1567,88 |
| 34 | 705889 | EXCAVACION TERRENO SEMIDURO H= 0 - 2 M. | M³ | 1326,38 |
| 35 | 705890 | EXCAVACION TERRENO DURO H= 0 - 2 M. | M³ | 809,54 |
| 36 | 705891 | CAMA DE APOYO (MATERIAL DE PRESTAMO FINO). | M³ | 125,43 |
| 37 | 705892 | RELLENO SELECCIONADO Y COPACTADO. | M³ | 680,99 |
| 38 | 705893 | RELLENO SIMPLE Y COMPACTADO CON MATERIAL COMUN. | M³ | 1220,57 |
| 39 | 705894 | PROV. Y COLOC. DE CINTA PREVENTIVA PARA TUBERIAS. | M | 1567,88 |
| 40 | 705895 | RELLENO COMPACTADO CON MATERIAL DE PRESTAMO (CAPA BASE). | M³ | 32,54 |
| 41 | 705896 | RETIRO DE EMPEDRADO. | M² | 81,34 |
| 42 | 705897 | REPLANTEO PARA AGUA POTABLE. | M | 1567,88 |
| 43 | 705898 | PROVISION TUBERIA C30 C-E FFD D=400MM. | M | 1567,88 |
| 44 | 705899 | PRUEBA HIDRAULICA PARA TUBERIAS DE AGUA POTABLE DE DN 300MM A 400MM. | M | 1567,88 |
| 45 | 705900 | INSTALACION TUBERIA FFD DE AGUA POTABLE DN=350 A 400MM. | M | 1567,88 |
| 46 | 705901 | PROVISION ACCESORIOS HUESA HIGUERANI A LOS ANGELES. | GLB | 1 |
| 47 | 705902 | INSTALACION ACCESORIOS HUESA HIGUERANI A LOS ANGELES. | GLB | 1 |
| 48 | 705903 | PROVISION VENTOSAS DE AIRE TANQUE HUASA HIGUERANI A CARCAMO LOS ANGELES C30 DN400. | GLB | 1 |
| 49 | 705904 | INSTALACION VENTOSAS DE AIRE TANQUE HUASA HIGUERANI A CARCAMO LOS ANGELES C30 DN400. | GLB | 1 |
| 50 | 705905 | PROVISION DESFOGUE TANQUE HUASA HIGUERANI A CARCAMO LOS ANGELES C30 DN400. | GLB | 1 |
| 51 | 705906 | INSTALACION DESFOGUE TANQUE HUASA HIGUERANI A CARCAMO LOS ANGELES C30 DN400. | GLB | 1 |
| 52 | 705907 | PROV. E INST. CAMARA DE VALVULA DE H°A° H=1.5-2M PARA DN<300MM. | PZA | 2 |
| 53 | 705908 | ANCLAJES DE HORMIGON CICLOPEO R180. | M3 | 14,33 |
| 54 | 705909 | REPOSICION EMPEDRADO SIN MATERIAL. | M² | 81,34 |
| 55 | 705910 | LIMPIEZA Y RETIRO DE ESCOMBROS. | M³ | 229,56 |
| 56 | 705911 | MOVILIZACION DE OBRA LOAS ANGELES A V. ISRAEL ALTO.. | GLB | 1 |
| 57 | 705912 | DERECHO DE COBRO POR OCUPAR TEMPORALMENTE UN BIEN MUNICIPAL PUBLICO.. | M | 2717,95 |
| 58 | 705913 | EXCAVACION TERRENO DURO H= 0 - 2 M.. | M³ | 3400,59 |
| 59 | 705914 | EXCAVACION TERRENO ROCA H= 0 - 2 M.. | M³ | 299,27 |
| 60 | 705915 | CAMA DE APOYO (MATERIAL DE PRESTAMO FINO).. | M³ | 217,44 |
| 61 | 705916 | RELLENO SELECCIONADO Y COPACTADO.. | M³ | 1084,93 |
| 62 | 705917 | RELLENO SELECCIONADO CON MATERIAL DE PRESTAMO (ARENA FINA).. | M³ | 95,58 |
| 63 | 705918 | RELLENO SIMPLE Y COMPACTADO CON MATERIAL COMUN.. | M³ | 1718,2 |
| 64 | 705919 | RELLENO Y COMPACTADO CON MATERIAL COMUN (PRESTAMO).. | M³ | 175,74 |
| 65 | 705920 | PROV. Y COLOC. DE CINTA PREVENTIVA PARA TUBERIAS.. | M | 2717,95 |
| 66 | 705921 | RELLENO COMPACTADO CON MATERIAL DE PRESTAMO (CAPA BASE).. | M³ | 278,72 |
| 67 | 705922 | RETIRO DE EMPEDRADO.. | M² | 696,79 |
| 68 | 705923 | REPLANTEO PARA AGUA POTABLE.. | M | 2717,95 |
| 69 | 705924 | PROVISION TUBERIA C30 C-E FFD D=400MM.. | M | 2717,95 |
| 70 | 705925 | PRUEBA HIDRAULICA PARA TUBERIAS DE AGUA POTABLE DE DN 300MM A 400MM.. | M | 2717,95 |
| 71 | 705926 | INSTALACION TUBERIA FFD DE AGUA POTABLE DN=350 A 400MM.. | M | 2717,95 |
| 72 | 705927 | PROVISION ACCESORIOS LOS ANGELES A V.ISRAEL ALTO.. | GLB | 1 |
| 73 | 705928 | INSTALACION ACCESORIOS LOS ANGELES A V.ISRAEL ALTO.. | GLB | 1 |
| 74 | 705929 | PROVISION DESFOGUE CARCAMO LOS ANGELES A CARCAMO INTERMEDIO.. | GLB | 1 |
| 75 | 705930 | INSTALACION DESFOGUE CARCAMO LOS ANGELES A CARCAMO INTERMEDIO.. | GLB | 1 |
| 76 | 705931 | PROVISION DESFOGUE CARCAMO INTERMEDIO A TANQUE VILLA ISRAEL ALTO.. | GLB | 1 |
| 77 | 705932 | INSTALACION DESFOGUE CARCAMO INTERMEDIO A TANQUE VILLA ISRAEL ALTO.. | GLB | 1 |
| 78 | 705933 | PROVISION VENTOSAS DE AIRE CARCAMO LOS ANGELES A CARCAMO INTERMEDIO.. | GLB | 1 |
| 79 | 705934 | INSTALACION VENTOSAS DE AIRE CARCAMO LOS ANGELES A CARCAMO INTERMEDIO.. | GLB | 1 |
| 80 | 705935 | PROVISION VENTOSAS DE AIRE CARCAMO INTERMEDIO A TANQUE VILLA ISRAEL ALTO 1.. | GLB | 1 |
| 81 | 705936 | INSTALACION VENTOSAS DE AIRE CARCAMO INTERMEDIO A TANQUE VILLA ISRAEL ALTO 1.. | GLB | 1 |
| 82 | 705937 | PROVICION VENTOSAS DE AIRE CARCAMO INTERMEDIO A TANQUE VILLA ISRAEL ALTO 2.. | GLB | 1 |
| 83 | 705938 | INSTALACION VENTOSAS DE AIRE CARCAMO INTERMEDIO A TANQUE VILLA ISRAEL ALTO 2.. | GLB | 1 |
| 84 | 705939 | PROV. E INST. CAMARA DE VALVULA DE H°A° H=1.5-2M PARA DN<300MM.. | PZA | 5 |
| 85 | 705940 | ANCLAJES DE HORMIGON CICLOPEO R180.. | M3 | 14,33 |
| 86 | 705941 | REPOSICION EMPEDRADO SIN MATERIAL.. | M² | 696,79 |
| 87 | 705942 | LIMPIEZA Y RETIRO DE ESCOMBROS.. | M³ | 715,84 |
| 88 | 705943 | MOVILIZACION DE OBRA V. ISRAEL A LOMAS DE JUNIO… | GLB | 1 |
| 89 | 705944 | DERECHO DE COBRO POR OCUPAR TEMPORALMENTE UN BIEN MUNICIPAL PUBLICO… | M | 1684,28 |
| 90 | 705945 | EXCAVACION TERRENO DURO H= 0 - 2 M… | M³ | 1209,31 |
| 91 | 705946 | EXCAVACION TERRENO ROCA H= 0 - 2 M… | M³ | 959,61 |
| 92 | 705947 | CAMA DE APOYO (MATERIAL DE PRESTAMO FINO)… | M³ | 134,74 |
| 93 | 705948 | RELLENO SELECCIONADO Y COPACTADO… | M³ | 380,64 |
| 94 | 705949 | RELLENO SELECCIONADO CON MATERIAL DE PRESTAMO (ARENA FINA)… | M³ | 297,34 |
| 95 | 705950 | RELLENO SIMPLE Y COMPACTADO CON MATERIAL COMUN… | M³ | 707,68 |
| 96 | 705951 | RELLENO Y COMPACTADO CON MATERIAL COMUN (PRESTAMO)… | M³ | 567,65 |
| 97 | 705952 | PROV. Y COLOC. DE CINTA PREVENTIVA PARA TUBERIAS… | M | 1684,28 |
| 98 | 705953 | RELLENO COMPACTADO CON MATERIAL DE PRESTAMO (CAPA BASE)… | M³ | 69,99 |
| 99 | 705954 | RETIRO DE EMPEDRADO… | M² | 174,98 |
| 100 | 705955 | REPLANTEO PARA AGUA POTABLE… | M | 1684,28 |
| 101 | 705956 | PROVISION TUBERIA C30 C-E FFD D=500MM… | M | 371,07 |
| 102 | 705957 | PROVISION TUBERIA C30 C-E FFD D=250MM… | M | 1313,21 |
| 103 | 705958 | PRUEBA HIDRAULICA PARA TUBERIAS DE AGUA POTABLE DE DN 150MM A 250MM… | M | 1313,21 |
| 104 | 705959 | PRUEBA HIDRAULICA PARA TUBERIAS DE AGUA POTABLE DE DN 450MM A 600MM… | M | 371,07 |
| 105 | 705960 | INSTALACION TUBERIA FFD DE AGUA POTABLE DN=450 A 500 MM… | M | 371,07 |
| 106 | 705961 | INSTALACION TUBERIA FFD DE AGUA POTABLE DN=250 A 300 MM… | M | 1313,21 |
| 107 | 705962 | PROVISION ACCESORIOS V.ISRAEL ALTO A LOMAS DE JUNIO… | GLB | 1 |
| 108 | 705963 | INSTALACION ACCESORIOS V.ISRAEL ALTO A LOMAS DE JUNIO… | GLB | 1 |
| 109 | 705964 | PROVISION VENTOSAS DE AIRE VILLA ISRAEL ALTO A TANQUE 2… | GLB | 1 |
| 110 | 705965 | INSTALACION VENTOSAS DE AIRE VILLA ISRAEL ALTO A TANQUE 2… | GLB | 1 |
| 111 | 705966 | PROVISION VENTOSAS DE AIRE VILLA ISRAEL ALTO A DISTRIBUCION… | GLB | 1 |
| 112 | 705967 | INSTALACION VENTOSAS DE AIRE VILLA ISRAEL ALTO A DISTRIBUCION… | GLB | 1 |
| 113 | 705968 | PROV. E INST. CAMARA DE HºAº H21 H=1.5-2M PARA VRP C/DADO DN 200 A 250MM… | PZA | 3 |
| 114 | 705969 | PROV. E INST. CAMARA DE HºAº H21 H=15-2M PARA VRP C/DADO DN 300-500MM… | PZA | 1 |
| 115 | 705970 | PROV. E INST. CAMARA DE VALVULA DE H°A° H=1.5-2M PARA DN<300MM… | PZA | 2 |
| 116 | 705971 | ANCLAJES DE HORMIGON CICLOPEO R180… | M3 | 18,43 |
| 117 | 705972 | DADOS DE HORMIGON CICLOPEO R180 PARA CAMARA VRP… | M3 | 1,23 |
| 118 | 705973 | REPOSICION EMPEDRADO SIN MATERIAL… | M² | 174,98 |
| 119 | 705974 | LIMPIEZA Y RETIRO DE ESCOMBROS… | M³ | 504,65 |
| 120 | 705975 | MOVILIZACION DE OBRA ESTRUCTURA 1 DE MAYO…. | GLB | 1 |
| 121 | 705976 | LETRERO DE OBRA…. | PZA | 1 |
| 122 | 705977 | REPLANTEO (ESTRUCTURAS Y EDIFICACIONES)…. | M² | 350 |
| 123 | 705978 | EXCAVACION EN ROCA…. | M³ | 19,34 |
| 124 | 705979 | HORMIGON POBRE E=5 CM (DOSIFICACION 1:8)…. | M² | ,86 |
| 125 | 705980 | ZAPATAS DE H° A° H21. | M³ | 5,18 |
| 126 | 705981 | VIGA DE ARRIOSTRE H° A° H21…. | M³ | 4,08 |
| 127 | 705982 | COLUMNAS DE H° A° H21…. | M³ | 4,33 |
| 128 | 705983 | VIGA CADENA H° A° H21…. | M³ | 8,52 |
| 129 | 705984 | LOSA ALIVIANADA C/ VIGUETA Y PLASTOFORMO…. | M² | 48,16 |
| 130 | 705985 | GRADAS H° A° H21…. | M³ | ,85 |
| 131 | 705986 | PROV. E INST. CUBIERTA DE CALAMINA GALVANIZADA N° 28 INCL/CERCHA METALICA…. | M² | 60,28 |
| 132 | 705987 | PROV. E INST. CUMBRERA DE CALAMINA GALVANIZADA N°28…. | M | 8,97 |
| 133 | 705988 | CIELO FALSO-INCLUYE MADERA Y MALLA…. | M² | 35,92 |
| 134 | 705989 | MURO DE LADRILLO 21H (DOS CARAS VISTAS)…. | M² | 258,61 |
| 135 | 705990 | CIMIENTO DE H° C° H18 (50% PD)…. | M³ | ,33 |
| 136 | 705991 | SOBRECIMIENTO DE H° C° H18 (50% PD)…. | M³ | ,18 |
| 137 | 705992 | REVOQUE DE YESO BAJO LOSA…. | M² | 35,92 |
| 138 | 705993 | REVOQUE DE YESO (CIELO FALSO)…. | M² | 35,92 |
| 139 | 705994 | REVOQUE DE YESO EN PAREDES…. | M² | 28,8 |
| 140 | 705995 | MESONES DE COCINA DE H° A° H21…. | M | 6,2 |
| 141 | 705996 | SOLADURA MAS CONTRAPISO DE H° S° (E=5CM)…. | M² | 48,16 |
| 142 | 705997 | PROV. E INST. CERAMICA NACIONAL…. | M² | 106,32 |
| 143 | 705998 | PROV. E INST. ZOCALO DE CERAMICA NACIONAL…. | M | 96 |
| 144 | 705999 | REVESTIMIENTO CERAMICA NACIONAL…. | M² | 13,68 |
| 145 | 706000 | REVOQUE DE CEMENTO…. | M² | 38,4 |
| 146 | 706001 | PROV. E INST. PUERTA DE MADERA ROBLE (2x1 M)…. | PZA | 9 |
| 147 | 706002 | PROV. E INST. VENTANA DE ALUMINIO INCL/VIDRIO DOBLE…. | M² | 13,48 |
| 148 | 706003 | PROV. E INSTALACION SANITARIA (TAZA, LAVAMANOS Y DUCHA)…. | GLB | 2 |
| 149 | 706004 | PROV. E INST. LAVAPLATOS INCL /ACCESORIOS Y GRIFO…. | GLB | 1 |
| 150 | 706005 | PROV. E INSTAL. REJAS DE PROTECCION DE VENTANAS…. | M² | 7,98 |
| 151 | 706006 | PROV E INSTAL BARANDA DE FIERRO FORJADO…. | M | 6,06 |
| 152 | 706007 | EXCAVACION EN ROCA, | M³ | 51,23 |
| 153 | 706008 | LINEA ELECTRICA, | M | 100 |
| 154 | 706009 | TABLERO PARA OPERACIÓN, | PZA | 1 |
| 155 | 706010 | CIRCUITOS ELECTRICOS, | GLB | 1 |
| 156 | 706011 | PROV. E INSTA. ACCESORIOS PARA ELEVACION, | GLB | 1 |
| 157 | 706012 | EXCAVACION EN ROCA,, | M³ | 26,99 |
| 158 | 706013 | MURO DE LADRILLO VISTO -12CM,, | M² | 506,1 |
| 159 | 706014 | PROV.COLOC.PUERTA MET.,, | M² | 30 |
| 160 | 706015 | CIMIENTO DE H° C° H18 (50% PD),, | M³ | 26,99 |
| 161 | 706016 | SOBRECIMIENTO DE H° C° H18 (50% PD),, | M³ | 10,12 |
| 162 | 706017 | HO.AO.COLUMNAS(ESTRUT.CORRIENTES)H21 NBH,, | M³ | 7,9 |
| 163 | 706018 | EXCAVACION EN ROCA,,, | M³ | 6954,85 |
| 164 | 706019 | HORMIGON FC=230 KG/CM2,,, | M³ | 380 |
| 165 | 706020 | HO.CO.ELEVACIONES ESTABILIZACION (HO 1:2:4-50 % PIEDRA),,, | M³ | 40,16 |
| 166 | 706021 | PROV. E INST. ACERO ESTRUCTURAL,,, | KG | 42721,78 |
| 167 | 706022 | DADO DE HORMIGON CICLOPEO R 180,,, | M3 | ,74 |
| 168 | 706023 | PROV. E INST. CAMARA DE HºAº H21 -REBALSE,,, | GLB | 1 |
| 169 | 706024 | PROV. E INST. CAMARA DE HºAº H21 - LLEGADA A CARCAMO 1RO DE MAYO,,, | GLB | 1 |
| 170 | 706025 | PROV. E INST. CAMARA DE HºAº H21-SALIDA CARCAMO 1 DE MAYO,,, | GLB | 1 |
| 171 | 706026 | PROVISION ACCESORIOS LLEGADA A CARCAMO 1 DE MAYO,,, | GLB | 1 |
| 172 | 706027 | INSTALACION ACCESORIOS LLEGADA A CARCAMO 1 DE MAYO,,, | GLB | 1 |
| 173 | 706028 | PROVISION ACCESORIOS REBALSE Y DRENAJE CARCAMO 1RO DE MAYO,,, | GLB | 1 |
| 174 | 706029 | INSTALACION ACCESORIOS REBALSE Y DRENAJE CARCAMO 1RO DE MAYO,,, | GLB | 1 |
| 175 | 706030 | PROVISION BOMBA DE EJE HORIZONTAL Q=324 L/S, H=200M, POT=250 KW,,, | PZA | 2 |
| 176 | 706031 | INSTALACION BOMBA DE EJE HORIZONTAL Q=324 L/S, H=200M, POT=250 KW,,, | PZA | 2 |
| 177 | 706032 | PROVISION FLUJOMETRO ELECTROMAGNETICO BRIDADO PN25 DN400,,, | PZA | 1 |
| 178 | 706033 | INSTALACION FLUJOMETRO ELECTROMAGNETICO BRIDADO PN25 DN400,,, | PZA | 1 |
| 179 | 706034 | PROVISION ACCESORIOS ESTACION DE BOMBEO 1 DE MAYO -PARTE 1,,, | GLB | 1 |
| 180 | 706035 | INSTALACION ACCESORIOS ESTACION DE BOMBEO 1 DE MAYO -PARTE 1,,, | GLB | 1 |
| 181 | 706036 | PROVISION ACCESORIOS ESTACION DE BOMBEO 1 DE MAYO -PARTE 2,,, | GLB | 1 |
| 182 | 706037 | INSTALACION ACCESORIOS ESTACION DE BOMBEO 1 DE MAYO -PARTE 2,,, | GLB | 1 |
| 183 | 706038 | INSTALACION DE FAENAS., | GLB | 1 |
| 184 | 706039 | REPLANTEO E INSPECCIÓN DE LA LÍNEA DE MT., | GLB | 1 |
| 185 | 706040 | GESTION DEL DERECHO DE VÍA., | GLB | 1 |
| 186 | 706041 | TRANSPORTE DE MATERIALES GENERALES., | GLB | 1 |
| 187 | 706042 | CONSTRUCCION DE PILASTRA PARA PUESTO MEDIDOR., | GLB | 1 |
| 188 | 706043 | GESTIÓN DE PERMISOS CONSTRUCCIÓN LMT (ALCALDIA, ETC.)., | GLB | 1 |
| 189 | 706264 | PROV. E INST. DE MEDIDOR TRIFÁSICO Y ACCESORIOS (NO INCLUY. TRÁMITES)., | GLB | 1 |
| 190 | 706265 | SERVICIO DE MEDICIÓN DE PAT (TIERRA)., | GLB | 1 |
| 191 | 706266 | AJUSTE Y PRUEBAS., | GLB | 1 |
| 192 | 706267 | PROVISION, PLANTADO Y COMPACTADO DE POSTE 12/8 M (12M/800KGF)., | PZA | 2 |
| 193 | 706268 | INSTALACIÓN ESTRUCTURA VC7-1., | PZA | 1 |
| 194 | 706269 | INSTALACION ESTRUCTURA VM3-30 RECONECTADOR 27KV., | PZA | 1 |
| 195 | 706270 | INSTALACION ESTRUCTURA PUESTO DE MEDICION MT 24,9KV., | PZA | 1 |
| 196 | 706271 | INSTALACIÓN DE PUESTA A TIERRA VM2-11., | PZA | 1 |
| 197 | 706272 | CONECTORES DE LINEA VIVA., | PTO | 1 |
| 198 | 706273 | INSTALACION BAJANTE DE PROTECCION TUBO AOGO RIGIDO 2., | PTO | 1 |
| 199 | 706274 | CABLEADO Y FLECHADO COND. ACSR # 1/0 AWG., | M | 75 |
| 200 | 706275 | PROVISION TRANSFORMADOR TRIFÁSICO 24,9/0.4-0.23 KV 1000KVA., | PZA | 1 |
| 201 | 706276 | INSTALACION TRANSFORMADOR TRIFÁSICO 24,9/0.4-0.23 KV 1000KVA., | PZA | 1 |
| 202 | 706277 | PROVISION TABLERO DISTRIBUCION PPAL 1600A TDG., | PZA | 1 |
| 203 | 706278 | INSTALACION TABLERO DISTRIBUCION PPAL 1600A TDG., | PZA | 1 |
| 204 | 706279 | PROVISION TABLERO DE DISTRIBUCION CCM 1600A TD1., | PZA | 1 |
| 205 | 706280 | INSTALACION TABLERO DE DISTRIBUCION CCM 1600A TD1., | PZA | 1 |
| 206 | 706281 | PROVISION TABLERO VARIADOR DE FRECUENCIA 250KW., | PZA | 2 |
| 207 | 706282 | INSTALACION TABLERO VARIADOR DE FRECUENCIA 250KW., | PZA | 2 |
| 208 | 706283 | PROVISION TABLERO FILTRO PASIVO 450A 5% P/VDF C/REFRIGERADOR MURAL., | PZA | 2 |
| 209 | 706284 | INSTALACION TABLERO FILTRO PASIVO 450A 5% P/VDF C/REFRIGERADOR MURAL., | PZA | 2 |
| 210 | 706285 | PROVISION TABLERO DE CONTROL Y COMUNICACIÓN CCM., | GLB | 1 |
| 211 | 706286 | INSTALACION TABLERO DE CONTROL Y COMUNICACIÓN CCM., | GLB | 1 |
| 212 | 706287 | PROV. E INST. TOMACORRIENTE DE FUERZA MONOFASICO 2P+T 32A., | GLB | 6 |
| 213 | 706288 | PROV. SERVICIO DE ANALISIS DE CALIDAD DE ENERGIA., | PZA | 1 |
| 214 | 706289 | PROV. E INST. CABLE FLEXIBLE CU 1X185 MM2, 90ºC 0,6/1KV., | M | 650 |
| 215 | 706290 | PROV. E INST. CABLE FLEXIBLE CU 1X120 MM2, 90ºC 0,6/1KV., | M | 360 |
| 216 | 706291 | PROV. E INST. TUBO RIGIDO 3/4 AOGO., | M | 60 |
| 217 | 706292 | PROV. E INST. TUBO RIGIDO 1 AOGO., | M | 15 |
| 218 | 706293 | PROV. E INST. TUBO RIGIDO 3 AOGO., | M | 50 |
| 219 | 706294 | PROV. E INST. TUBO RIGIDO 4 AOGO., | M | 20 |
| 220 | 706295 | PROV. E INST. POLITUBO 4 PVC., | M | 20 |
| 221 | 706296 | PROV. E INST. BANDEJA CANALETA 60CM CON TAPA., | M | 4 |
| 222 | 706297 | PROV. E INST. TUBO EMT 3/4., | M | 55 |
| 223 | 706298 | PROV. E INST. TUBO EMT 1., | M | 35 |
| 224 | 706299 | PROV. E INST. TUBO PVC 3/4., | M | 190 |
| 225 | 706300 | CONST. CAMARA DE PASO ELECTRICA 30 X 30 CM., | GLB | 6 |
| 226 | 706301 | CONST. CAMARA DE PASO ELECTRICA 60 X 60 CM., | GLB | 3 |
| 227 | 706302 | CONST. CAMARA DE PASO ELECTRICA 100 X 100 CM., | GLB | 4 |
| 228 | 706303 | PROV. E INST. LUMINARIA 200W IP66 EN POSTE 7M BRAZO SIMPLE., | PZA | 10 |
| 229 | 706304 | PROV. E INST. TABLERO ELECTRICO VIVIENDA TDV., | PZA | 1 |
| 230 | 706305 | PROV. E INST. PANEL DE ILUMINACION LED 18W 220V 1620LM., | PZA | 15 |
| 231 | 706306 | PROV. E INST. TOMACORRIENTES 2P+T 16A DOBLE EN PLACA., | GLB | 17 |
| 232 | 706307 | PROV. E INST. INTERRUPTOR SIMPLE 10A 220V., | PZA | 8 |
| 233 | 706308 | PROV. E INST. INTERRUPTOR DOBLE 10A 220V., | PZA | 2 |
| 234 | 706309 | PROV. E INST. INTERRUPTOR CONMUTADOR 10A 220V., | PZA | 2 |
| 235 | 706310 | PROV. E INST. CAJA PROTECCION DUCHA ELECTRICA., | PZA | 2 |
| 236 | 706311 | PROV. E INST. CABLE 2,5 MM2 70º 750V., | M | 1200 |
| 237 | 706312 | PROV. E INST. CABLE 4 MM2 70º 750V., | ML | 320 |
| 238 | 706313 | PROV. E INST. CABLE 10 MM2 70º 750V., | ML | 250 |
| 239 | 706314 | IMPLEMENTACION DE CCTV CARCAMO INICIAL., | GLB | 1 |
| 240 | 706315 | PROV. Y COLOC. MALLA OLIMPICA FG 2 C/2.5M., | M2 | 54,72 |
| 241 | 706316 | POSTE TUBERIA FG2., | M | 15 |
| 242 | 706317 | PUERTA TUBERIA FG 2., | M | 9,2 |
| 243 | 706318 | EXCAVACION TERRENO ROCA H= 0 - 2 M., | M³ | 16,9 |
| 244 | 706319 | ZAPATAS DE H° A° H21., | M³ | 3,38 |
| 245 | 706320 | RELLENO SIMPLE Y COMPACTADO CON MATERIAL COMUN., | M³ | 9,68 |
| 246 | 706321 | COLUMNAS DE H° A° H21., | M³ | 1,45 |
| 247 | 706322 | SOLADO DE PISO CON PIEDRA MANZANA., | M2 | 91,91 |
| 248 | 706323 | HORMIGON PARA PLATAFORMA E=10 CM., | M3 | 9,19 |
| 249 | 706324 | PROV. E INST CUBIERTA DE CALAMINA-INCLUYE COLUMNAS., | M2 | 96,96 |
| 250 | 706325 | PROV. Y COLOC. MALLA OLIMPICA FG 2 C/2.5M.., | M2 | 45,02 |
| 251 | 706326 | POSTE TUBERIA FG2.., | M | 20 |
| 252 | 706327 | PUERTA TUBERIA FG 2.., | M | 7,4 |
| 253 | 706328 | CIMIENTO DE H° C° H18 (50% PD).., | M³ | ,27 |
| 254 | 706329 | EXCAVACION TERRENO ROCA H= 0 - 2 M.., | M³ | 2,05 |
| 255 | 706330 | ZAPATAS DE H° A° H21.., | M³ | ,51 |
| 256 | 706331 | RELLENO SIMPLE Y COMPACTADO CON MATERIAL COMUN.., | M³ | ,86 |
| 257 | 706332 | COLUMNAS DE H° A° H21.., | M³ | ,18 |
| 258 | 706333 | SOLADO DE PISO CON PIEDRA MANZANA.., | M2 | 9 |
| 259 | 706334 | HORMIGON PLATAFORMA E=15 CM FC=210 KG/CM2.., | M3 | 1,35 |
| 260 | 706335 | PROV. E INST. CUBIERTA DE CALAMNA N26 INCLUYE COLUMNAS.., | M2 | 4,52 |
| 261 | 706336 | MOVILIZACION DE OBRA ESTRUCTURA HUASA HIGUERANI.., | GLB | 1 |
| 262 | 706337 | LETRERO DE OBRA.., | PZA | 1 |
| 263 | 706338 | REPLANTEO (ESTRUCTURAS Y EDIFICACIONES).., | M² | 923 |
| 264 | 706339 | EXCAVACION EN ROCA.., | M³ | 19,34 |
| 265 | 706340 | HORMIGON POBRE E=5 CM (DOSIFICACION 1:8).., | M² | ,86 |
| 266 | 706341 | ZAPATAS DE H° A° H21..,. | M³ | 5,18 |
| 267 | 706342 | VIGA DE ARRIOSTRE H° A° H21.., | M³ | 4,08 |
| 268 | 706343 | COLUMNAS DE H° A° H21..,.. | M³ | 4,33 |
| 269 | 706344 | VIGA CADENA H° A° H21.., | M³ | 8,52 |
| 270 | 706345 | LOSA ALIVIANADA C/ VIGUETA Y PLASTOFORMO., | M² | 48,16 |
| 271 | 706346 | GRADAS H° A° H21.., | M³ | ,85 |
| 272 | 706347 | PROV. E INST. CUBIERTA DE CALAMINA GALVANIZADA N° 28 INCL/CERCHA METALICA.., | M² | 60,28 |
| 273 | 706348 | PROV. E INST. CUMBRERA DE CALAMINA GALVANIZADA N°28.., | M | 8,97 |
| 274 | 706349 | CIELO FALSO-INCLUYE MADERA Y MALLA.., | M² | 35,92 |
| 275 | 706350 | MURO DE LADRILLO 21H (DOS CARAS VISTAS).., | M² | 258,61 |
| 276 | 706351 | CIMIENTO DE H° C° H18 (50% PD)..,.. | M³ | ,33 |
| 277 | 706352 | SOBRECIMIENTO DE H° C° H18 (50% PD).., | M³ | ,18 |
| 278 | 706353 | REVOQUE DE YESO BAJO LOSA.., | M² | 35,92 |
| 279 | 706354 | REVOQUE DE YESO (CIELO FALSO).., | M² | 35,92 |
| 280 | 706355 | REVOQUE DE YESO EN PAREDES.., | M² | 28,8 |
| 281 | 706356 | MESONES DE COCINA DE H° A° H21.., | M | 6,2 |
| 282 | 706357 | SOLADURA MAS CONTRAPISO DE H° S° (E=5CM).., | M² | 48,16 |
| 283 | 706358 | PROV. E INST. CERAMICA NACIONAL.., | M² | 106,32 |
| 284 | 706359 | PROV. E INST. ZOCALO DE CERAMICA NACIONAL.., | M | 96 |
| 285 | 706360 | REVESTIMIENTO CERAMICA NACIONAL.., | M² | 13,68 |
| 286 | 706361 | REVOQUE DE CEMENTO.., | M² | 38,4 |
| 287 | 706362 | PROV. E INST. PUERTA DE MADERA ROBLE (2x1 M).., | PZA | 9 |
| 288 | 706363 | PROV. E INST. VENTANA DE ALUMINIO INCL/VIDRIO DOBLE.., | M² | 13,48 |
| 289 | 706364 | PROV. E INSTALACION SANITARIA (TAZA, LAVAMANOS Y DUCHA).., | GLB | 2 |
| 290 | 706365 | PROV. E INST. LAVAPLATOS INCL /ACCESORIOS Y GRIFO.., | GLB | 1 |
| 291 | 706366 | PROV. E INSTAL. REJAS DE PROTECCION DE VENTANAS.., | M² | 7,98 |
| 292 | 706367 | PROV E INSTAL BARANDA DE FIERRO FORJADO.., | M | 6,06 |
| 293 | 706368 | EXCAVACION EN ROCA…, | M³ | 6,5 |
| 294 | 706369 | CIMIENTO DE H° C° H18 (50% PD)…, | M³ | 6,05 |
| 295 | 706370 | SOBRECIMIENTO DE H° C° H18 (50% PD)…, | M³ | 1,45 |
| 296 | 706371 | HO.AO.COLUMNAS(ESTRUT.CORRIENTES)H21 NBH…, | M³ | 3,38 |
| 297 | 706372 | VIGA DE ARRIOSTRE H° A° H21…, | M³ | 8,93 |
| 298 | 706373 | MURO DE LADRILLO -12CM…, | M² | 87,94 |
| 299 | 706374 | PROV.COLOC.PUERTA MET…, | M² | 3,75 |
| 300 | 706375 | PROV. E INST. CUBIERTA DE CALAMINA GALVANIZADA N° 28 INCL/CERCHA METALICA…, | M² | 140 |
| 301 | 706376 | EXCAVACION EN ROCA…,. | M³ | 42,87 |
| 302 | 706377 | MURO DE LADRILLO -12CM…,. | M² | 803,97 |
| 303 | 706378 | PROV.COLOC.PUERTA MET…,. | M² | 30 |
| 304 | 706379 | CIMIENTO DE H° C° H18 (50% PD)…,. | M³ | 42,87 |
| 305 | 706380 | SOBRECIMIENTO DE H° C° H18 (50% PD)…,. | M³ | 16,07 |
| 306 | 706381 | HO.AO.COLUMNAS(ESTRUT.CORRIENTES)H21 NBH…,. | M³ | 12,56 |
| 307 | 706382 | EXCAVACION EN ROCA…,.. | M³ | 5304,36 |
| 308 | 706383 | HORMIGON FC=230 KG/CM2…, | M³ | 827,37 |
| 309 | 706384 | PROV. E INST. ACERO ESTRUCTURAL…, | KG | 74456,45 |
| 310 | 706385 | PROV. E INST. CAMARA DE HºAº H21 - LLEGADA TANQUE Nº3 (HUASA HIGUERANI…, | GLB | 1 |
| 311 | 706386 | PROV. E INST. CAMARA DE HºAº H21 - SALIDA TANQUE Nº3 (HUASA HIGUERANI A LOS ANGELES…, | GLB | 1 |
| 312 | 706387 | PROV. E INST. CAMARA DE HºAº H21 - SALIDA TANQUE Nº3 (HUASA HIGUERANI A RED)…, | GLB | 1 |
| 313 | 706388 | PROV. E INST. CAMARA DE HºAº H21 - SALIDA TANQUE Nº3 (HUASA HIGUERANI A RED EXISTENTE)…, | GLB | 1 |
| 314 | 706389 | DADO DE HORMIGON CICLOPEO R 180…, | M3 | ,83 |
| 315 | 706390 | PROV. E INST. CAMARA DE HºAº H21 -REBALSE…, | GLB | 1 |
| 316 | 706391 | PROVISION ACCESORIOS REBALSE Y DRENAJE TANQUE HUASA HIGUERANI…, | GLB | 1 |
| 317 | 706392 | INSTALACION ACCESORIOS REBALSE Y DRENAJE TANQUE HUASA HIGUERANI…, | GLB | 1 |
| 318 | 706393 | PROVISION ACCESORIOS LLEGADA TANQUE HUASA HIGUERANI…, | GLB | 1 |
| 319 | 706394 | INSTALACION ACCESORIOS LLEGADA TANQUE HUASA HIGUERANI…, | GLB | 1 |
| 320 | 706395 | PROVISION FLUJOMETRO ELECTROMAGNETICO PN16 DN300MM…, | PZA | 1 |
| 321 | 706396 | INSTALACION FLUJOMETRO ELECTROMAGNETICO PN16 DN300MM…, | PZA | 1 |
| 322 | 706397 | PROVISION ACCESORIOS SALIDA TANQUE HUASA HIGUERANI A DISTRIBUCION 1…, | GLB | 1 |
| 323 | 706398 | INSTALACION ACCESORIOS SALIDA TANQUE HUASA HIGUERANI A DISTRIBUCION 1…, | GLB | 1 |
| 324 | 706399 | PROVISION ACCESORIOS SALIDA TANQUE HUASA HIGUERANI A DISTRIBUCION 2…, | GLB | 1 |
| 325 | 706400 | INSTALACION ACCESORIOS SALIDA TANQUE HUASA HIGUERANI A DISTRIBUCION 2…, | GLB | 1 |
| 326 | 706401 | PROVISION ACCESORIOS Y VALVULA LIMITADORA DE CAUDAL-1…, | GLB | 1 |
| 327 | 706402 | INSTALACION ACCESORIOS Y VALVULA LIMITADORA DE CAUDAL-1…, | GLB | 1 |
| 328 | 706403 | PROVISION FLUJOMETRO ELECTROMAGNETICO PN16 DN300MM…,. | PZA | 1 |
| 329 | 706404 | INSTALACION FLUJOMETRO ELECTROMAGNETICO PN16 DN300MM…,. | PZA | 1 |
| 330 | 706405 | PROVISION ACCESORIOS Y VALVULA LIMITADORA DE CAUDAL-2…, | GLB | 1 |
| 331 | 706406 | INSTALACION ACCESORIOS Y VALVULA LIMITADORA DE CAUDAL-2…, | GLB | 1 |
| 332 | 706407 | PROVISION FLUJOMETRO ELECTROMAGNETICO PN16 DN250MM…,.. | PZA | 1 |
| 333 | 706408 | INSTALACION FLUJOMETRO ELECTROMAGNETICO PN16 DN250MM…,, | PZA | 1 |
| 334 | 706409 | PROVISION ACCESORIO VALVULA DE ALIVIO TANQUE HUASA HIGUERANI-CARCAMO LOS ANGELES…, | GLB | 1 |
| 335 | 706410 | INSTALACION ACCESORIO VALVULA DE ALIVIO TANQUE HUASA HIGUERANI-CARCAMO LOS ANGELES…, | GLB | 1 |
| 336 | 706411 | PROVISION ACCESORIOS FLUJOMETRO SALIDA TANQUE HUASA HIGUERANI - PARTE 1…, | GLB | 3 |
| 337 | 706412 | INSTALACION ACCESORIOS FLUJOMETRO SALIDA TANQUE HUASA HIGUERANI - PARTE 1…, | GLB | 3 |
| 338 | 706413 | PROVISION ACCESORIOS FLUJOMETRO SALIDA TANQUE HUASA HIGUERANI - PARTE 2…, | GLB | 3 |
| 339 | 706414 | INSTALACION ACCESORIOS FLUJOMETRO SALIDA TANQUE HUASA HIGUERANI - PARTE 2…, | GLB | 3 |
| 340 | 706415 | PROVISION FLUJOMETRO ELECTROMAGNETICO BRIDADO PN16 DN40…, | PZA | 1 |
| 341 | 706416 | INSTALACION FLUJOMETRO ELECTROMAGNETICO BRIDADO PN16 DN40…, | PZA | 1 |
| 342 | 706417 | IMPLEMENTACION DE CCTV TANQUE N°3 HUASA HIGUERANI…, | GLB | 1 |
| 343 | 706418 | INSTALACION DE FAENAS…, | GLB | 1 |
| 344 | 706419 | REPLANTEO E INSPECCIÓN DE LA LÍNEA DE BT…, | GLB | 1 |
| 345 | 706420 | TRANSPORTE DE MATERIALES GENERALES…, | GLB | 1 |
| 346 | 706421 | CONSTRUCCION DE PILASTRA PARA PUESTO MEDIDOR…, | GLB | 1 |
| 347 | 706422 | PROV. E INST. DE MEDIDOR MONOFASICO Y ACCESORIOS…, | GLB | 1 |
| 348 | 706423 | SERVICIO DE MEDICIÓN DE PAT (TIERRA)…, | GLB | 1 |
| 349 | 706424 | AJUSTE Y PRUEBAS…, | GLB | 1 |
| 350 | 706425 | ARMADO DE ESTRUCTURA J17…, | PZA | 1 |
| 351 | 706426 | INSTALACIÓN DE PUESTA A TIERRA VM2-11…, | PZA | 1 |
| 352 | 706427 | PROV. E INST. CABLE 6 MM2…, | ML | 18 |
| 353 | 706428 | PROV. E INST. TUBO EMT 3/4…, | M | 260 |
| 354 | 706429 | PROV. E INST. TUBO EMT 1…, | M | 10 |
| 355 | 706430 | PROV. E INST. TUBO PVC 3/4…, | M | 190 |
| 356 | 706431 | CONST. CAMARA DE PASO ELECTRICA 30 X 30 CM…, | GLB | 2 |
| 357 | 706432 | PROV. E INST. LUMINARIA 200W IP66 EN POSTE 7M BRAZO SIMPLE…, | PZA | 20 |
| 358 | 706433 | PROV. E INST. TABLERO ELECTRICO VIVIENDA…, | PZA | 1 |
| 359 | 706434 | PROV. E INST. PANEL DE ILUMINACION LED 18W 220V 1620LM…, | PZA | 21 |
| 360 | 706435 | PROV. E INST. TOMACORRIENTES 2P+T 16A DOBLE EN PLACA…, | GLB | 17 |
| 361 | 706436 | PROV. E INST. INTERRUPTOR SIMPLE 10A 220V…, | PZA | 4 |
| 362 | 706437 | PROV. E INST. INTERRUPTOR DOBLE 10A 220V…, | PZA | 1 |
| 363 | 706438 | PROV. E INST. INTERRUPTOR CONMUTADOR 10A 220V…, | PZA | 2 |
| 364 | 706439 | PROV. E INST. CAJA PROTECCION DUCHA ELECTRICA…, | PZA | 2 |
| 365 | 706440 | PROV. E INST. CABLE 2,5 MM2 70º 750V…, | M | 1400 |
| 366 | 706441 | PROV. E INST. CABLE 4 MM2 70º 750V…, | ML | 300 |
| 367 | 706442 | PROV. E INST. CABLE 6 MM2 70º 750V…, | ML | 120 |
| 368 | 706443 | MOVILIZACION DE OBRA - ESTRUCTURA 1 DE MAYO,,. | GLB | 1 |
| 369 | 706444 | LETRERO DE OBRA,,. | PZA | 1 |
| 370 | 706445 | REPLANTEO (ESTRUCTURAS Y EDIFICACIONES),,. | M² | 673 |
| 371 | 706446 | EXCAVACION EN ROCA,,. | M³ | 19,34 |
| 372 | 706447 | HORMIGON POBRE E=5 CM (DOSIFICACION 1:8),,. | M² | ,86 |
| 373 | 706448 | ZAPATAS DE H° A° H21,,. | M³ | 5,18 |
| 374 | 706449 | VIGA DE ARRIOSTRE H° A° H21,,. | M³ | 4,08 |
| 375 | 706450 | COLUMNAS DE H° A° H21,,. | M³ | 4,33 |
| 376 | 706451 | VIGA CADENA H° A° H21,,. | M³ | 8,52 |
| 377 | 706452 | LOSA ALIVIANADA C/ VIGUETA Y PLASTOFORMO,,. | M² | 48,16 |
| 378 | 706453 | GRADAS H° A° H21,,. | M³ | ,85 |
| 379 | 706454 | PROV. E INST. CUBIERTA DE CALAMINA GALVANIZADA N° 28 INCL/CERCHA METALICA,,. | M² | 60,28 |
| 380 | 706455 | PROV. E INST. CUMBRERA DE CALAMINA GALVANIZADA N°28,,. | M | 8,97 |
| 381 | 706456 | CIELO FALSO-INCLUYE MADERA Y MALLA,,. | M² | 35,92 |
| 382 | 706457 | MURO DE LADRILLO 21H (DOS CARAS VISTAS),,. | M² | 258,61 |
| 383 | 706458 | CIMIENTO DE H° C° H18 (50% PD),,. | M³ | ,33 |
| 384 | 706459 | SOBRECIMIENTO DE H° C° H18 (50% PD),,. | M³ | ,18 |
| 385 | 706460 | REVOQUE DE YESO BAJO LOSA,,. | M² | 35,92 |
| 386 | 706461 | REVOQUE DE YESO (CIELO FALSO),,. | M² | 35,92 |
| 387 | 706462 | REVOQUE DE YESO EN PAREDES,,. | M² | 28,8 |
| 388 | 706463 | MESONES DE COCINA DE H° A° H21,,. | M | 6,2 |
| 389 | 706464 | SOLADURA MAS CONTRAPISO DE H° S° (E=5CM),,. | M² | 48,16 |
| 390 | 706465 | PROV. E INST. CERAMICA NACIONAL,,. | M² | 106,32 |
| 391 | 706466 | PROV. E INST. ZOCALO DE CERAMICA NACIONAL,,. | M | 96 |
| 392 | 706467 | REVESTIMIENTO CERAMICA NACIONAL,,. | M² | 13,68 |
| 393 | 706468 | REVOQUE DE CEMENTO,,. | M² | 38,4 |
| 394 | 706469 | PROV. E INST. PUERTA DE MADERA ROBLE (2x1 M),,. | PZA | 9 |
| 395 | 706470 | PROV. E INST. VENTANA DE ALUMINIO INCL/VIDRIO DOBLE,,. | M² | 13,48 |
| 396 | 706471 | PROV. E INSTALACION SANITARIA (TAZA, LAVAMANOS Y DUCHA),,. | GLB | 2 |
| 397 | 706472 | PROV. E INST. LAVAPLATOS INCL /ACCESORIOS Y GRIFO,,. | GLB | 1 |
| 398 | 706473 | PROV. E INSTAL. REJAS DE PROTECCION DE VENTANAS,,. | M² | 7,98 |
| 399 | 706474 | PROV E INSTAL BARANDA DE FIERRO FORJADO,,. | M | 6,06 |
| 400 | 706475 | EXCAVACION EN ROCA,,,. | M³ | 6,05 |
| 401 | 706476 | CIMIENTO DE H° C° H18 (50% PD),,,. | M³ | 6,05 |
| 402 | 706477 | SOBRECIMIENTO DE H° C° H18 (50% PD),,,. | M³ | 1,45 |
| 403 | 706478 | HO.AO.COLUMNAS(ESTRUT.CORRIENTES)H21 NBH,,,. | M³ | 1,69 |
| 404 | 706479 | VIGA DE ARRIOSTRE H° A° H21,,,. | M³ | 9,22 |
| 405 | 706480 | MURO DE LADRILLO -12CM,,,. | M² | 81,66 |
| 406 | 706481 | PROV.COLOC.PUERTA MET.,,,. | M² | 3,75 |
| 407 | 706482 | PROV. E INST. CUBIERTA DE CALAMINA GALVANIZADA N° 28 INCL/CERCHA METALICA,,,. | M² | 165,76 |
| 408 | 706483 | LINEA ELECTRICA,,,. | M | 100 |
| 409 | 706484 | TABLERO PARA OPERACIÓN,,,. | PZA | 1 |
| 410 | 706485 | CIRCUITOS ELECTRICOS,,,. | GLB | 1 |
| 411 | 706486 | PROV. E INSTA. ACCESORIOS PARA ELEVACION,,,. | GLB | 1 |
| 412 | 706487 | EXCAVACION EN ROCA,., | M³ | 34,55 |
| 413 | 706488 | MURO DE LADRILLO -12CM,., | M² | 647,91 |
| 414 | 706489 | PROV.COLOC.PUERTA MET.,., | M² | 30 |
| 415 | 706490 | CIMIENTO DE H° C° H18 (50% PD),., | M³ | 34,55 |
| 416 | 706491 | SOBRECIMIENTO DE H° C° H18 (50% PD),., | M³ | 12,95 |
| 417 | 706492 | HO.AO.COLUMNAS(ESTRUT.CORRIENTES)H21 NBH,., | M³ | 10,12 |
| 418 | 706493 | EXCAVACION EN ROCA,.,. | M³ | 6866,71 |
| 419 | 706494 | HORMIGON FC=230 KG/CM2,., | M³ | 613,05 |
| 420 | 706495 | HO.CO.ELEVACIONES ESTABILIZACION (HO 1:2:4-50 % PIEDRA),., | M³ | 27,86 |
| 421 | 706496 | PROV. E INST. ACERO ESTRUCTURAL,., | KG | 60976,98 |
| 422 | 706497 | DADO DE HORMIGON CICLOPEO R 180,., | M3 | ,64 |
| 423 | 706498 | PROV. E INST. CAMARA DE HºAº H21 -REBALSE,., | GLB | 1 |
| 424 | 706499 | PROV. E INST. CAMARA DE HºAº H21-LLEGADA CARCAMO LOS ANGELES,., | GLB | 1 |
| 425 | 706500 | PROVISION ACCESORIOS REBALSE Y DRENAJE,., | GLB | 1 |
| 426 | 706501 | INSTALACION ACCESORIOS REBALSE Y DRENAJE,., | GLB | 1 |
| 427 | 706502 | PROVISION ACCESORIOS LLEGADA CARCAMO LOS ANGELES - PART 1,., | GLB | 1 |
| 428 | 706503 | INSTALACION ACCESORIOS LLEGADA CARCAMO LOS ANGELES - PART 1,., | GLB | 1 |
| 429 | 706504 | PROVISION ACCESORIOS LLEGADA CARCAMO LOS ANGELES - PART 2,., | GLB | 1 |
| 430 | 706505 | INSTALACION ACCESORIOS LLEGADA CARCAMO LOS ANGELES - PART 2,., | GLB | 1 |
| 431 | 706506 | PROVISION BOMBA VERTICAL Q=244, H=210M, POT=266KW,., | PZA | 2 |
| 432 | 706507 | INSTALACION BOMBA VERTICAL Q=244, H=210M, POT=266KW,., | PZA | 2 |
| 433 | 706508 | PROVISION ACCESORIOS CARCAMO LOS ANGELES - PART 1,., | GLB | 1 |
| 434 | 706509 | INSTALACION ACCESORIOS CARCAMO LOS ANGELES - PART 1,., | GLB | 1 |
| 435 | 706510 | PROVISION ACCESORIOS CARCAMO LOS ANGELES - PART 2,., | GLB | 1 |
| 436 | 706511 | INSTALACION ACCESORIOS CARCAMO LOS ANGELES - PART 2,., | GLB | 1 |
| 437 | 706512 | PROVISION ACCESORIOS CARCAMO LOS ANGELES - PART 3,., | GLB | 1 |
| 438 | 706513 | INSTALACION ACCESORIOS CARCAMO LOS ANGELES - PART 3,., | GLB | 1 |
| 439 | 706514 | PROVISION ACCESORIOS CARCAMO LOS ANGELES - PART 4,., | GLB | 1 |
| 440 | 706515 | INSTALACION ACCESORIOS CARCAMO LOS ANGELES - PART 4,., | GLB | 1 |
| 441 | 706516 | IMPLEMENTACION DE CCTV CARCAMO LOS ANGELES,., | GLB | 1 |
| 442 | 706517 | PROVISION TABLERO DISTRIBUCION PPAL 1600A TDG,., | PZA | 1 |
| 443 | 706518 | INSTALACION TABLERO DISTRIBUCION PPAL 1600A TDG,., | PZA | 1 |
| 444 | 706519 | PROVISION TABLERO DE DISTRIBUCION CCM 1600A TD1,., | PZA | 1 |
| 445 | 706520 | INSTALACION TABLERO DE DISTRIBUCION CCM 1600A TD1,., | PZA | 1 |
| 446 | 706521 | PROVISION TABLERO VARIADOR DE FRECUENCIA 355KW,., | PZA | 2 |
| 447 | 706522 | INSTALACION TABLERO VARIADOR DE FRECUENCIA 355KW,., | PZA | 2 |
| 448 | 706523 | PROVISION TABLERO FILTRO PASIVO 550A 5% P/VDF C/REFRIGERADOR MURAL,., | PZA | 2 |
| 449 | 706524 | INSTALACION TABLERO FILTRO PASIVO 550A 5% P/VDF C/REFRIGERADOR MURAL,., | PZA | 2 |
| 450 | 706525 | PROVISION TABLERO DE CONTROL Y COMUNICACIÓN CCM,., | GLB | 1 |
| 451 | 706526 | INSTALACION TABLERO DE CONTROL Y COMUNICACIÓN CCM,., | GLB | 1 |
| 452 | 706527 | PROV. E INST. TOMACORRIENTE DE FUERZA MONOFASICO 2P+T 32A,., | GLB | 6 |
| 453 | 706528 | PROV. SERVICIO DE ANALISIS DE CALIDAD DE ENERGIA,., | PZA | 1 |
| 454 | 706529 | PROV. E INST. CABLE FLEXIBLE CU 1X185 MM2, 90ºC 0,6/1KV,., | M | 480 |
| 455 | 706530 | PROV. E INST. CABLE FLEXIBLE CU 1X150 MM2, 90ºC 0,6/1KV,., | M | 90 |
| 456 | 706531 | PROV. E INST. TUBO RIGIDO 3/4 AOGO,., | M | 60 |
| 457 | 706532 | PROV. E INST. TUBO RIGIDO 1 AOGO,., | M | 30 |
| 458 | 706533 | PROV. E INST. TUBO RIGIDO 4 AOGO,., | M | 77 |
| 459 | 706534 | PROV. E INST. POLITUBO 4 PVC,., | M | 30 |
| 460 | 706535 | PROV. E INST. BANDEJA CANALETA 60CM CON TAPA,., | M | 4 |
| 461 | 706536 | PROV. E INST. TUBO EMT 3/4,., | M | 160 |
| 462 | 706537 | PROV. E INST. TUBO EMT 1,., | M | 20 |
| 463 | 706538 | PROV. E INST. TUBO PVC 3/4,., | M | 190 |
| 464 | 706539 | CONST. CAMARA DE PASO ELECTRICA 30 X 30 CM,., | GLB | 4 |
| 465 | 706540 | CONST. CAMARA DE PASO ELECTRICA 100 X 100 CM,., | GLB | 2 |
| 466 | 706541 | PROV. E INST. LUMINARIA 200W IP66 EN POSTE 7M BRAZO SIMPLE,., | PZA | 16 |
| 467 | 706542 | PROV. E INST. TABLERO ELECTRICO VIVIENDA TDV,., | PZA | 1 |
| 468 | 706543 | PROV. E INST. PANEL DE ILUMINACION LED 18W 220V 1620LM,., | PZA | 13 |
| 469 | 706544 | PROV. E INST. TOMACORRIENTES 2P+T 16A DOBLE EN PLACA,., | GLB | 15 |
| 470 | 706545 | PROV. E INST. INTERRUPTOR SIMPLE 10A 220V,., | PZA | 8 |
| 471 | 706546 | PROV. E INST. INTERRUPTOR DOBLE 10A 220V,., | PZA | 2 |
| 472 | 706547 | PROV. E INST. INTERRUPTOR CONMUTADOR 10A 220V,., | PZA | 2 |
| 473 | 706548 | PROV. E INST. CAJA PROTECCION DUCHA ELECTRICA,., | PZA | 2 |
| 474 | 706549 | PROV. E INST. CABLE 2,5 MM2,., | M | 1900 |
| 475 | 706550 | PROV. E INST. CABLE 4 MM2,., | ML | 420 |
| 476 | 706551 | PROV. E INST. CABLE 10 MM2,., | ML | 250 |
| 477 | 706552 | INSTALACION DE FAENAS,., | GLB | 1 |
| 478 | 706553 | REPLANTEO E INSPECCIÓN DE LA LÍNEA DE MT,., | GLB | 1 |
| 479 | 706554 | GESTION DEL DERECHO DE VÍA,., | GLB | 1 |
| 480 | 706555 | TRANSPORTE DE MATERIALES GENERALES,., | GLB | 1 |
| 481 | 706556 | CONSTRUCCION DE PILASTRA PARA PUESTO MEDIDOR,., | GLB | 1 |
| 482 | 706557 | GESTIÓN DE PERMISOS CONSTRUCCIÓN LMT (ALCALDIA, ETC.),., | GLB | 1 |
| 483 | 706558 | PROV. E INST. DE MEDIDOR TRIFÁSICO Y ACCESORIOS (NO INCLUY. TRÁMITES),., | GLB | 1 |
| 484 | 706559 | SERVICIO DE MEDICIÓN DE PAT (TIERRA),., | GLB | 1 |
| 485 | 706560 | AJUSTE Y PRUEBAS,., | GLB | 1 |
| 486 | 706561 | PROVISION, PLANTADO Y COMPACTADO DE POSTE 12/8 M (12M/800KGF),., | PZA | 12 |
| 487 | 706562 | INSTALACION ESCTRUTURA VC1,., | PZA | 6 |
| 488 | 706563 | INSTALACIÓN ESTRUCTURA VC7-1,., | PZA | 2 |
| 489 | 706564 | INSTALACIÓN ESTRUCTURA VC7-1 C/SECCIONADOR,., | PZA | 2 |
| 490 | 706565 | INSTALACION ESCTRUTURA VC-8,., | PZA | 2 |
| 491 | 706566 | INSTALACION ESTRUCTURA VM3-30 RECONECTADOR 27KV,., | PZA | 1 |
| 492 | 706567 | INSTALACION ESTRUCTURA PUESTO DE MEDICION MT 24,9KV,., | PZA | 1 |
| 493 | 706568 | INSTALACIÓN DE PUESTA A TIERRA VM2-11,., | PZA | 1 |
| 494 | 706569 | RIENDA SIMPLE PARA MT (VE1-MT),., | PZA | 6 |
| 495 | 706570 | CONECTORES DE LINEA VIVA,., | PTO | 1 |
| 496 | 706571 | INSTALACION BAJANTE DE PROTECCION TUBO AOGO RIGIDO 2,., | PTO | 1 |
| 497 | 706572 | CABLEADO Y FLECHADO COND. ACSR # 1/0 AWG,., | M | 1500 |
| 498 | 706573 | PROVISION TRANSFORMADOR TRIFÁSICO 24,9/0.4-0.23 KV 1000KVA,., | PZA | 1 |
| 499 | 706574 | INSTALACION TRANSFORMADOR TRIFÁSICO 24,9/0.4-0.23 KV 1000KVA,., | PZA | 1 |
| 500 | 706575 | PROV. Y COLOC. MALLA OLIMPICA FG 2 C/2.5M,., | M2 | 66,24 |
| 501 | 706576 | POSTE TUBERIA FG2,., | M | 20 |
| 502 | 706577 | PUERTA TUBERIA FG 2,., | M | 9,8 |
| 503 | 706578 | PROV. E INST. CUBIERTA DE CALAMINA CON CERCHA Y ACCESORIOS,., | M2 | 204 |
| 504 | 706579 | PROV. Y COLOC. MALLA OLIMPICA FG 2 C/2.5M- | M2 | 46,56 |
| 505 | 706580 | POSTE TUBERIA FG2- | M | 20 |
| 506 | 706581 | PUERTA TUBERIA FG 2- | M | 7,4 |
| 507 | 706582 | CIMIENTO DE H° C° H18 (50% PD)- | M³ | ,27 |
| 508 | 706583 | EXCAVACION TERRENO ROCA H= 0 - 2 M- | M³ | 2,05 |
| 509 | 706584 | ZAPATAS DE H° A° H21- | M³ | ,51 |
| 510 | 706585 | RELLENO SIMPLE Y COMPACTADO CON MATERIAL COMUN- | M³ | ,86 |
| 511 | 706586 | COLUMNAS DE H° A° H21- | M³ | ,18 |
| 512 | 706587 | SOLADO DE PISO CON PIEDRA MANZANA- | M2 | 9 |
| 513 | 706588 | HORMIGON PLATAFORMA E=15 CM FC=210 KG/CM2- | M3 | 1,35 |
| 514 | 706589 | PROV. E INST. CUBIERTA DE CALAMNA N26 INCLUYE COLUMNAS- | M2 | 4,52 |
| 515 | 706590 | MOVILIZACION DE OBRA - ESTRUCTURA INTERMEDIO (COLMENAR)- | GLB | 1 |
| 516 | 706591 | LETRERO DE OBRA- | PZA | 1 |
| 517 | 706592 | REPLANTEO (ESTRUCTURAS Y EDIFICACIONES)- | M² | 228 |
| 518 | 706593 | EXCAVACION EN ROCA- | M³ | 6,48 |
| 519 | 706594 | CIMIENTO DE H° C° H18 (50% PD)-. | M³ | 6,48 |
| 520 | 706595 | SOBRECIMIENTO DE H° C° H18 (50% PD)- | M³ | 1,55 |
| 521 | 706596 | HO.AO.COLUMNAS(ESTRUT.CORRIENTES)H21 NBH- | M³ | 168,75 |
| 522 | 706597 | VIGA DE ARRIOSTRE H° A° H21- | M³ | 5,24 |
| 523 | 706598 | MURO DE LADRILLO -12CM- | M² | 84,32 |
| 524 | 706599 | PROV.COLOC.PUERTA MET.- | M² | 3,75 |
| 525 | 706600 | PROV. E INST. CUBIERTA DE CALAMINA GALVANIZADA N° 28 INCL/CERCHA METALICA- | M² | 90,74 |
| 526 | 706601 | EXCAVACION EN ROCA-. | M³ | 21,14 |
| 527 | 706602 | MURO DE LADRILLO -12CM-. | M² | 396,42 |
| 528 | 706603 | PROV.COLOC.PUERTA MET.-. | M² | 15 |
| 529 | 706604 | CIMIENTO DE H° C° H18 (50% PD)-.. | M³ | 21,14 |
| 530 | 706605 | SOBRECIMIENTO DE H° C° H18 (50% PD)-. | M³ | 7,92 |
| 531 | 706606 | HO.AO.COLUMNAS(ESTRUT.CORRIENTES)H21 NBH-. | M³ | 6,19 |
| 532 | 706607 | LINEA ELECTRICA- | M | 100 |
| 533 | 706608 | TABLERO PARA OPERACIÓN- | PZA | 1 |
| 534 | 706609 | CIRCUITOS ELECTRICOS- | GLB | 1 |
| 535 | 706610 | PROV. E INSTA. ACCESORIOS PARA ELEVACION- | GLB | 1 |
| 536 | 706611 | EXCAVACION EN ROCA-.. | M³ | 2472 |
| 537 | 706612 | HORMIGON FC=230 KG/CM2- | M³ | 398,42 |
| 538 | 706613 | HO.CO.ELEVACIONES ESTABILIZACION (HO 1:2:4-50 % PIEDRA)- | M³ | 31,85 |
| 539 | 706614 | PROV. E INST. ACERO ESTRUCTURAL- | KG | 36352,69 |
| 540 | 706615 | PROV. E INST. CAMARA DE HºAº H21 - LLEGADA CARCAMO INTERMEDIO (COLMENAR)- | GLB | 1 |
| 541 | 706616 | DADO DE HORMIGON CICLOPEO R 180- | M3 | ,32 |
| 542 | 706617 | PROV. E INST. CAMARA DE HºAº H21 -REBALSE- | GLB | 1 |
| 543 | 706618 | PROVISION ACCESORIOS REBALSE Y DRENAJE- | GLB | 1 |
| 544 | 706619 | INSTALACION ACCESORIOS REBALSE Y DRENAJE- | GLB | 1 |
| 545 | 706620 | PROVISION ACCESORIOS LLEGADA CARCAMO INTERMEDIO - PART 1- | GLB | 1 |
| 546 | 706621 | INSTALACION ACCESORIOS LLEGADA CARCAMO INTERMEDIO - PART 1- | GLB | 1 |
| 547 | 706622 | PROVISION ACCESORIOS LLEGADA CARCAMO INTERMEDIO - PART 2- | GLB | 1 |
| 548 | 706623 | INSTALACION ACCESORIOS LLEGADA CARCAMO INTERMEDIO - PART 2- | GLB | 1 |
| 549 | 706624 | PROVISION ACCESORIO CARCAMO INTERMEDIO - PART 1- | GLB | 1 |
| 550 | 706625 | INSTALACION ACCESORIO CARCAMO INTERMEDIO - PART 1- | GLB | 1 |
| 551 | 706626 | PROVISION ACCESORIO CARCAMO INTERMEDIO - PART 2- | GLB | 1 |
| 552 | 706627 | INSTALACION ACCESORIO CARCAMO INTERMEDIO - PART 2- | GLB | 1 |
| 553 | 706628 | PROVISION ACCESORIO CARCAMO INTERMEDIO - PART 3- | GLB | 1 |
| 554 | 706629 | INSTALACION ACCESORIO CARCAMO INTERMEDIO - PART 3- | GLB | 1 |
| 555 | 706630 | PROVISION ACCESORIO CARCAMO INTERMEDIO - PART 4- | GLB | 1 |
| 556 | 706631 | INSTALACION ACCESORIO CARCAMO INTERMEDIO - PART 4- | GLB | 1 |
| 557 | 706632 | PROVISION BOMBA DE EJE VERTICAL Q=360 M3/H, H=200M, POT=258 KW- | GLB | 2 |
| 558 | 706633 | INSTALACION BOMBA DE EJE VERTICAL Q=360 M3/H, H=200M, POT=258 KW- | GLB | 2 |
| 559 | 706634 | IMPLEMENTACION DE CCTV CARCAMO INTERMEDIO COLMENAR- | GLB | 1 |
| 560 | 706635 | PROVISION TABLERO DISTRIBUCION PPAL 1600A TDG- | PZA | 1 |
| 561 | 706636 | INSTALACION TABLERO DISTRIBUCION PPAL 1600A TDG- | PZA | 1 |
| 562 | 706637 | PROVISION TABLERO DE DISTRIBUCION CCM 1600A TD1- | PZA | 1 |
| 563 | 706638 | INSTALACION TABLERO DE DISTRIBUCION CCM 1600A TD1- | PZA | 1 |
| 564 | 706639 | PROVISION TABLERO VARIADOR DE FRECUENCIA 355KW- | PZA | 2 |
| 565 | 706640 | INSTALACION TABLERO VARIADOR DE FRECUENCIA 355KW- | PZA | 2 |
| 566 | 706641 | PROVISION TABLERO FILTRO PASIVO 550A 5% P/VDF C/REFRIGERADOR MURAL- | PZA | 2 |
| 567 | 706642 | INSTALACION TABLERO FILTRO PASIVO 550A 5% P/VDF C/REFRIGERADOR MURAL- | PZA | 2 |
| 568 | 706643 | PROVISION TABLERO DE CONTROL Y COMUNICACIÓN CCM- | GLB | 1 |
| 569 | 706644 | INSTALACION TABLERO DE CONTROL Y COMUNICACIÓN CCM- | GLB | 1 |
| 570 | 706645 | PROV. E INST. TOMACORRIENTE DE FUERZA MONOFASICO 2P+T 32A- | GLB | 6 |
| 571 | 706646 | PROV. SERVICIO DE ANALISIS DE CALIDAD DE ENERGIA- | PZA | 1 |
| 572 | 706647 | PROV. E INST. CABLE FLEXIBLE CU 1X185 MM2, 90ºC 0,6/1KV- | M | 380 |
| 573 | 706648 | PROV. E INST. CABLE FLEXIBLE CU 1X150 MM2, 90ºC 0,6/1KV- | M | 90 |
| 574 | 706649 | PROV. E INST. TUBO RIGIDO 3/4 AOGO- | M | 60 |
| 575 | 706650 | PROV. E INST. TUBO RIGIDO 1 AOGO- | M | 10 |
| 576 | 706651 | PROV. E INST. TUBO RIGIDO 3 AOGO- | M | 12 |
| 577 | 706652 | PROV. E INST. TUBO RIGIDO 4 AOGO- | M | 25 |
| 578 | 706653 | PROV. E INST. POLITUBO 4 PVC- | M | 30 |
| 579 | 706654 | PROV. E INST. BANDEJA CANALETA 60CM CON TAPA- | M | 4 |
| 580 | 706655 | PROV. E INST. TUBO EMT 3/4- | M | 160 |
| 581 | 706656 | PROV. E INST. TUBO EMT 1- | M | 20 |
| 582 | 706657 | PROV. E INST. TUBO PVC 3/4- | M | 190 |
| 583 | 706658 | CONST. CAMARA DE PASO ELECTRICA 30 X 30 CM- | GLB | 4 |
| 584 | 706659 | CONST. CAMARA DE PASO ELECTRICA 100 X 100 CM- | GLB | 2 |
| 585 | 706660 | PROV. E INST. LUMINARIA 200W IP66 EN POSTE 7M BRAZO SIMPLE- | PZA | 6 |
| 586 | 706661 | PROV. E INST. TABLERO ELECTRICO VIVIENDA TDV- | PZA | 1 |
| 587 | 706662 | PROV. E INST. PANEL DE ILUMINACION LED 18W 220V 1620LM- | PZA | 13 |
| 588 | 706663 | PROV. E INST. TOMACORRIENTES 2P+T 16A DOBLE EN PLACA- | GLB | 15 |
| 589 | 706664 | PROV. E INST. INTERRUPTOR SIMPLE 10A 220V- | PZA | 8 |
| 590 | 706665 | PROV. E INST. INTERRUPTOR DOBLE 10A 220V- | PZA | 2 |
| 591 | 706666 | PROV. E INST. INTERRUPTOR CONMUTADOR 10A 220V- | PZA | 2 |
| 592 | 706667 | PROV. E INST. CAJA PROTECCION DUCHA ELECTRICA- | PZA | 2 |
| 593 | 706668 | PROV. E INST. CABLE 2,5 MM2- | M | 1200 |
| 594 | 706669 | PROV. E INST. CABLE 4 MM2- | ML | 420 |
| 595 | 706670 | PROV. E INST. CABLE10 MM2- | ML | 250 |
| 596 | 706671 | INSTALACION DE FAENAS_ | GLB | 1 |
| 597 | 706672 | REPLANTEO E INSPECCIÓN DE LA LÍNEA DE MT_ | GLB | 1 |
| 598 | 706673 | GESTION DEL DERECHO DE VÍA_ | GLB | 1 |
| 599 | 706674 | TRANSPORTE DE MATERIALES GENERALES_ | GLB | 1 |
| 600 | 706675 | CONSTRUCCION DE PILASTRA PARA PUESTO MEDIDOR_ | GLB | 1 |
| 601 | 706676 | GESTIÓN DE PERMISOS CONSTRUCCIÓN LMT (ALCALDIA, ETC.)_ | GLB | 1 |
| 602 | 706677 | PROV. E INST. DE MEDIDOR TRIFÁSICO Y ACCESORIOS (NO INCLUY. TRÁMITES)_ | GLB | 1 |
| 603 | 706678 | SERVICIO DE MEDICIÓN DE PAT (TIERRA)_ | GLB | 1 |
| 604 | 706679 | AJUSTE Y PRUEBAS_ | GLB | 1 |
| 605 | 706680 | PROVISION, PLANTADO Y COMPACTADO DE POSTE 12/8 M (12M/800KGF)_ | PZA | 33 |
| 606 | 706681 | INSTALACION ESCTRUTURA VC-1_ | PZA | 20 |
| 607 | 706682 | INSTALACIÓN ESTRUCTURA VC7-1_ | PZA | 2 |
| 608 | 706683 | INSTALACIÓN ESTRUCTURA VC7-1 C/SECCIONADOR_ | PZA | 2 |
| 609 | 706684 | INSTALACION ESCTRUTURA VC-8_ | PZA | 7 |
| 610 | 706685 | INSTALACION ESTRUCTURA VM3-30 RECONECTADOR 27KV_ | PZA | 1 |
| 611 | 706686 | INSTALACION ESTRUCTURA PUESTO DE MEDICION MT 24,9KV_ | PZA | 1 |
| 612 | 706687 | INSTALACIÓN DE PUESTA A TIERRA VM2-11_ | PZA | 1 |
| 613 | 706688 | RIENDA SIMPLE PARA MT (VE1-MT)_ | PZA | 14 |
| 614 | 706689 | CONECTORES DE LINEA VIVA_ | PTO | 1 |
| 615 | 706690 | INSTALACION BAJANTE DE PROTECCION TUBO AOGO RIGIDO 2_ | PTO | 1 |
| 616 | 706691 | CABLEADO Y FLECHADO COND. ACSR # 1/0 AWG_ | M | 9300 |
| 617 | 706692 | PROVISION TRANSFORMADOR TRIFÁSICO 24,9/0.4-0.23 KV 1000KVA_ | PZA | 1 |
| 618 | 706693 | INSTALACION TRANSFORMADOR TRIFÁSICO 24,9/0.4-0.23 KV 1000KVA_ | PZA | 1 |
| 619 | 706694 | PROV. Y COLOC. MALLA OLIMPICA FG 2 C/2.5M_ | M2 | 66,24 |
| 620 | 706695 | POSTE TUBERIA FG2_ | M | 20 |
| 621 | 706696 | PUERTA TUBERIA FG 2_ | M | 9,2 |
| 622 | 706697 | PROV. E INST. CUBIERTA DE CALAMINA CON CERCHA Y ACCESORIOS_ | M2 | 191,25 |
| 623 | 706698 | PROV. Y COLOC. MALLA OLIMPICA FG 2 C/2.5M_. | M2 | 46,56 |
| 624 | 706699 | POSTE TUBERIA FG2_. | M | 20 |
| 625 | 706700 | PUERTA TUBERIA FG 2_. | M | 7 |
| 626 | 706701 | CIMIENTO DE H° C° H18 (50% PD)_ | M³ | ,27 |
| 627 | 706702 | EXCAVACION TERRENO ROCA H= 0 - 2 M_ | M³ | 2,05 |
| 628 | 706703 | ZAPATAS DE H° A° H21_ | M³ | ,51 |
| 629 | 706704 | RELLENO SIMPLE Y COMPACTADO CON MATERIAL COMUN_ | M³ | ,86 |
| 630 | 706705 | COLUMNAS DE H° A° H21_ | M³ | ,18 |
| 631 | 706706 | SOLADO DE PISO CON PIEDRA MANZANA_ | M2 | 9 |
| 632 | 706707 | HORMIGON PLATAFORMA E=15 CM FC=210 KG/CM2_ | M3 | 1,35 |
| 633 | 706708 | PROV. E INST. CUBIERTA DE CALAMNA N26 INCLUYE COLUMNAS_ | M2 | 4,52 |
| 634 | 706709 | MOVILIZACION DE OBRA ESTRUCTURA VILLA ISRAEL ALTO_ | GLB | 1 |
| 635 | 706710 | LETRERO DE OBRA_ | PZA | 1 |
| 636 | 706711 | REPLANTEO (ESTRUCTURAS Y EDIFICACIONES)_ | M² | 673 |
| 637 | 706712 | EXCAVACION EN ROCA_ | M³ | 19,34 |
| 638 | 706713 | HORMIGON POBRE E=5 CM (DOSIFICACION 1:8)_ | M² | ,86 |
| 639 | 706714 | ZAPATAS DE H° A° H21,,,. | M³ | 5,18 |
| 640 | 706715 | VIGA DE ARRIOSTRE H° A° H21_ | M³ | 4,08 |
| 641 | 706716 | COLUMNAS DE H° A° H21_. | M³ | 4,33 |
| 642 | 706717 | VIGA CADENA H° A° H21_ | M³ | 8,52 |
| 643 | 706718 | LOSA ALIVIANADA C/ VIGUETA Y PLASTOFORMO_ | M² | 48,16 |
| 644 | 706719 | GRADAS H° A° H21_ | M³ | ,85 |
| 645 | 706720 | PROV. E INST. CUBIERTA DE CALAMINA GALVANIZADA N° 28 INCL/CERCHA METALICA_ | M² | 60,28 |
| 646 | 706721 | PROV. E INST. CUMBRERA DE CALAMINA GALVANIZADA N°28_ | M | 8,97 |
| 647 | 706722 | CIELO FALSO-INCLUYE MADERA Y MALLA_ | M² | 35,92 |
| 648 | 706723 | MURO DE LADRILLO 21H (DOS CARAS VISTAS)_ | M² | 258,61 |
| 649 | 706724 | CIMIENTO DE H° C° H18 (50% PD).- | M³ | ,33 |
| 650 | 706725 | SOBRECIMIENTO DE H° C° H18 (50% PD)_ | M³ | ,18 |
| 651 | 706726 | REVOQUE DE YESO BAJO LOSA_ | M² | 35,92 |
| 652 | 706727 | REVOQUE DE YESO (CIELO FALSO)_ | M² | 35,92 |
| 653 | 706728 | REVOQUE DE YESO EN PAREDES_ | M² | 28,8 |
| 654 | 706729 | MESONES DE COCINA DE H° A° H21_ | M | 6,2 |
| 655 | 706730 | SOLADURA MAS CONTRAPISO DE H° S° (E=5CM)_ | M² | 48,16 |
| 656 | 706731 | PROV. E INST. CERAMICA NACIONAL_ | M² | 106,32 |
| 657 | 706732 | PROV. E INST. ZOCALO DE CERAMICA NACIONAL_ | M | 96 |
| 658 | 706733 | REVESTIMIENTO CERAMICA NACIONAL_ | M² | 13,68 |
| 659 | 706734 | REVOQUE DE CEMENTO_ | M² | 38,4 |
| 660 | 706735 | PROV. E INST. PUERTA DE MADERA ROBLE (2x1 M)_ | PZA | 9 |
| 661 | 706736 | PROV. E INST. VENTANA DE ALUMINIO INCL/VIDRIO DOBLE_ | M² | 13,48 |
| 662 | 706737 | PROV. E INSTALACION SANITARIA (TAZA, LAVAMANOS Y DUCHA)_ | GLB | 2 |
| 663 | 706738 | PROV. E INST. LAVAPLATOS INCL /ACCESORIOS Y GRIFO_ | GLB | 1 |
| 664 | 706739 | PROV. E INSTAL. REJAS DE PROTECCION DE VENTANAS_ | M² | 7,98 |
| 665 | 706740 | PROV E INSTAL BARANDA DE FIERRO FORJADO_ | M | 6,06 |
| 666 | 706741 | EXCAVACION EN ROCA/ | M³ | 25,37 |
| 667 | 706742 | MURO DE LADRILLO -12CM/ | M² | 475,74 |
| 668 | 706743 | PROV.COLOC.PUERTA MET./ | M² | 22,5 |
| 669 | 706744 | CIMIENTO DE H° C° H18 (50% PD)/ | M³ | 25,37 |
| 670 | 706745 | SOBRECIMIENTO DE H° C° H18 (50% PD)/ | M³ | 9,5 |
| 671 | 706746 | HO.AO.COLUMNAS(ESTRUT.CORRIENTES)H21 NBH/ | M³ | 7,43 |
| 672 | 706747 | EXCAVACION EN ROCA/. | M³ | 5304,36 |
| 673 | 706748 | HORMIGON FC=230 KG/CM2/ | M³ | 455,6 |
| 674 | 706749 | PROV. E INST. ACERO ESTRUCTURAL/ | KG | 50501,5 |
| 675 | 706750 | DADO DE HORMIGON CICLOPEO R 180/ | M3 | ,7 |
| 676 | 706751 | PROV. E INST. CAMARA DE HºAº H21 -REBALSE/ | GLB | 1 |
| 677 | 706752 | PROV. E INST. CAMARA DE HºAº H21-LLEGADA N1 TANQUE V. ISRAEL ALTO/ | PZA | 1 |
| 678 | 706753 | PROV. E INST. CAMARA DE HºAº H21-SALIDA N1 TANQUE V. ISRAEL ALTO A TANQUE N2 LOMAS DE JUNIO/ | PZA | 1 |
| 679 | 706754 | PROV. E INST. CAMARA DE HºAº H21-SALIDA N1 V. TANQUE ISRAEL ALTO A REDES/ | PZA | 1 |
| 680 | 706755 | PROVISION ACCESORIOS REBALSE Y DRENAJE TANQUE V.ISRAEL ALTO/ | GLB | 1 |
| 681 | 706756 | INTALACION ACCESORIOS REBALSE Y DRENAJE TANQUE V.ISRAEL ALTO/ | GLB | 1 |
| 682 | 706757 | PROVISION ACCESORIOS LLEGADA TANQUE VILLA ISRAEL ALTO-PARTE 1/ | GLB | 1 |
| 683 | 706758 | INSTALACION ACCESORIOS LLEGADA TANQUE VILLA ISRAEL ALTO-PARTE 1/ | GLB | 1 |
| 684 | 706759 | PROVISION ACCESORIOS LLEGADA TANQUE VILLA ISRAEL ALTO - PARTE 2/ | GLB | 1 |
| 685 | 706760 | INSTALACION ACCESORIOS LLEGADA TANQUE VILLA ISRAEL ALTO - PARTE 2/ | GLB | 1 |
| 686 | 706761 | PROVISION ACCESORIOS SALIDA TANQUE ISRAEL ALTO-PARTE 1/ | GLB | 1 |
| 687 | 706762 | INSTALACION ACCESORIOS SALIDA TANQUE ISRAEL ALTO-PARTE 1/ | GLB | 1 |
| 688 | 706763 | PROVISION ACCESORIOS SALIDA TANQUE ISRAEL ALTO -PARTE 2/ | GLB | 1 |
| 689 | 706764 | INSTALACION ACCESORIOS SALIDA TANQUE ISRAEL ALTO -PARTE 2/ | GLB | 1 |
| 690 | 706765 | PROVISION ACCESORIOS VRP TANQUE VILLA ISRAEL ALTO A TANQUE 2 - PARTE 1/ | GLB | 1 |
| 691 | 706766 | INSTALACION ACCESORIOS VRP TANQUE VILLA ISRAEL ALTO A TANQUE 2 - PARTE 1/ | GLB | 1 |
| 692 | 706767 | PROVISION ACCESORIOS VRP TANQUE VILLA ISRAEL ALTO A TANQUE 2 - PARTE 2/ | GLB | 1 |
| 693 | 706768 | INSTALACION ACCESORIOS VRP TANQUE VILLA ISRAEL ALTO A TANQUE 2 - PARTE 2/ | GLB | 1 |
| 694 | 706769 | PROVISION ACCESORIOS VRP TANQUE VILLA ISRAEL ALTO A TANQUE 2 - PARTE 3/ | GLB | 1 |
| 695 | 706770 | INSTALACION ACCESORIOS VRP TANQUE VILLA ISRAEL ALTO A TANQUE 2 - PARTE 3/ | GLB | 1 |
| 696 | 706771 | PROVISION ACCESORIOS 2DA VRP TANQUE VILLA ISRAEL ALTO A TANQUE 2 - PARTE 1/ | GLB | 1 |
| 697 | 706772 | INSTALACION ACCESORIOS 2DA VRP TANQUE VILLA ISRAEL ALTO A TANQUE 2 - PARTE 1/ | GLB | 1 |
| 698 | 706773 | PROVISION ACCESORIOS 2DA VRP TANQUE VILLA ISRAEL ALTO A TANQUE 2 - PARTE 2/ | GLB | 1 |
| 699 | 706774 | INSTALACION ACCESORIOS 2DA VRP TANQUE VILLA ISRAEL ALTO A TANQUE 2 - PARTE 2/ | GLB | 1 |
| 700 | 706775 | PROVISION ACCESORIOS 2DA VRP TANQUE VILLA ISRAEL ALTO A TANQUE 2 - PARTE 3/ | GLB | 1 |
| 701 | 706776 | INSTALACION ACCESORIOS 2DA VRP TANQUE VILLA ISRAEL ALTO A TANQUE 2 - PARTE 3/ | GLB | 1 |
| 702 | 706777 | PROVISION ACCESORIOS SALIDA TANQUE VILLA ISRAEL ALTO - PARTE 1; | GLB | 1 |
| 703 | 706778 | INSTALACION ACCESORIOS SALIDA TANQUE VILLA ISRAEL ALTO - PARTE 1; | GLB | 1 |
| 704 | 706779 | PROVISION ACCESORIOS SALIDA TANQUE VILLA ISRAEL ALTO - PARTE 2; | GLB | 1 |
| 705 | 706780 | INSTALACION ACCESORIOS SALIDA TANQUE VILLA ISRAEL ALTO - PARTE 2; | GLB | 1 |
| 706 | 706781 | PROVICION FLUJOMETRO ELECTROMAGNETICO BRIDADO; | PZA | 1 |
| 707 | 706782 | INSTALACION FLUJOMETRO ELECTROMAGNETICO BRIDADO; | PZA | 1 |
| 708 | 706783 | PROVISION ACCESORIOS VRP DOBLE TANQUE VILLA ISRAEL ALTO - PARTE 1; | GLB | 1 |
| 709 | 706784 | INSTALACION ACCESORIOS VRP DOBLE TANQUE VILLA ISRAEL ALTO - PARTE 1; | GLB | 1 |
| 710 | 706785 | PROVISION ACCESORIOS VRP DOBLE TANQUE VILLA ISRAEL ALTO - PARTE 2; | GLB | 1 |
| 711 | 706786 | INSTALACION ACCESORIOS VRP DOBLE TANQUE VILLA ISRAEL ALTO - PARTE 2; | GLB | 1 |
| 712 | 706787 | PROVISION ACCESORIOS VRP DOBLE TANQUE VILLA ISRAEL ALTO - PARTE 3; | GLB | 1 |
| 713 | 706788 | INSTALACION ACCESORIOS VRP DOBLE TANQUE VILLA ISRAEL ALTO - PARTE 3; | GLB | 1 |
| 714 | 706789 | IMPLEMENTACION DE CCTV N°1 VILLA ISRAEL ALTO; | GLB | 1 |
| 715 | 706790 | IMPLEMENTACION DE CCTV N°2 VILLA ISRAEL ALTO; | GLB | 1 |
| 716 | 706791 | INSTALACION DE FAENAS; | GLB | 1 |
| 717 | 706792 | REPLANTEO E INSPECCIÓN DE LA LÍNEA DE BT; | GLB | 1 |
| 718 | 706793 | TRANSPORTE DE MATERIALES GENERALES; | GLB | 1 |
| 719 | 706794 | CONSTRUCCION DE PILASTRA PARA PUESTO MEDIDOR; | GLB | 1 |
| 720 | 706795 | PROV. E INST. DE MEDIDOR MONOFASICO Y ACCESORIOS; | GLB | 1 |
| 721 | 706796 | SERVICIO DE MEDICIÓN DE PAT (TIERRA); | GLB | 1 |
| 722 | 706797 | AJUSTE Y PRUEBAS; | GLB | 1 |
| 723 | 706798 | ARMADO DE ESTRUCTURA J17; | PZA | 1 |
| 724 | 706799 | INSTALACIÓN DE PUESTA A TIERRA VM2-11; | PZA | 1 |
| 725 | 706800 | PROV. E INST. CABLE 6 MM2; | ML | 18 |
| 726 | 706801 | PROV. E INST. TUBO EMT 3/4; | M | 160 |
| 727 | 706802 | PROV. E INST. TUBO EMT 1; | M | 10 |
| 728 | 706803 | PROV. E INST. TUBO PVC 3/4; | M | 190 |
| 729 | 706804 | CONST. CAMARA DE PASO ELECTRICA 30 X 30 CM; | GLB | 2 |
| 730 | 706805 | PROV. E INST. LUMINARIA 200W IP66 EN POSTE 7M BRAZO SIMPLE; | PZA | 5 |
| 731 | 706806 | PROV. E INST. TABLERO ELECTRICO VIVIENDA; | PZA | 1 |
| 732 | 706807 | PROV. E INST. PANEL DE ILUMINACION LED 18W 220V 1620LM; | PZA | 21 |
| 733 | 706808 | PROV. E INST. TOMACORRIENTES 2P+T 16A DOBLE EN PLACA; | GLB | 17 |
| 734 | 706809 | PROV. E INST. INTERRUPTOR SIMPLE 10A 220V; | PZA | 4 |
| 735 | 706810 | PROV. E INST. INTERRUPTOR DOBLE 10A 220V; | PZA | 1 |
| 736 | 706811 | PROV. E INST. INTERRUPTOR CONMUTADOR 10A 220V; | PZA | 2 |
| 737 | 706812 | PROV. E INST. CAJA PROTECCION DUCHA ELECTRICA; | PZA | 2 |
| 738 | 706813 | PROV. E INST. CABLE 2,5 MM2 70º 750V; | M | 900 |
| 739 | 706814 | PROV. E INST. CABLE 4 MM2 70º 750V; | ML | 300 |
| 740 | 706815 | PROV. E INST. CABLE 6 MM2 70º 750V; | ML | 120 |
| 741 | 706816 | MOVILIZACION DE OBRA ESTRUCTURA LOMAS DE JUNIO; | GLB | 1 |
| 742 | 706817 | LETRERO DE OBRA; | PZA | 1 |
| 743 | 706818 | REPLANTEO (ESTRUCTURAS Y EDIFICACIONES); | M² | 553,88 |
| 744 | 706819 | EXCAVACION EN ROCA: | M³ | 19,34 |
| 745 | 706820 | HORMIGON POBRE E=5 CM (DOSIFICACION 1:8): | M² | ,86 |
| 746 | 706821 | ZAPATAS DE H° A° H21: | M³ | 5,18 |
| 747 | 706822 | VIGA DE ARRIOSTRE H° A° H21: | M³ | 4,08 |
| 748 | 706823 | COLUMNAS DE H° A° H21: | M³ | 4,33 |
| 749 | 706824 | VIGA CADENA H° A° H21: | M³ | 8,52 |
| 750 | 706825 | LOSA ALIVIANADA C/ VIGUETA Y PLASTOFORMO: | M² | 48,16 |
| 751 | 706826 | GRADAS H° A° H21: | M³ | ,85 |
| 752 | 706827 | PROV. E INST. CUBIERTA DE CALAMINA GALVANIZADA N° 28 INCL/CERCHA METALICA: | M² | 60,28 |
| 753 | 706828 | PROV. E INST. CUMBRERA DE CALAMINA GALVANIZADA N°28: | M | 8,97 |
| 754 | 706829 | CIELO FALSO-INCLUYE MADERA Y MALLA: | M² | 35,92 |
| 755 | 706830 | MURO DE LADRILLO 21H (DOS CARAS VISTAS): | M² | 258,61 |
| 756 | 706831 | CIMIENTO DE H° C° H18 (50% PD): | M³ | ,33 |
| 757 | 706832 | SOBRECIMIENTO DE H° C° H18 (50% PD): | M³ | ,18 |
| 758 | 706833 | REVOQUE DE YESO BAJO LOSA: | M² | 35,92 |
| 759 | 706834 | REVOQUE DE YESO (CIELO FALSO): | M² | 35,92 |
| 760 | 706835 | REVOQUE DE YESO EN PAREDES: | M² | 28,8 |
| 761 | 706836 | MESONES DE COCINA DE H° A° H21: | M | 6,2 |
| 762 | 706837 | SOLADURA MAS CONTRAPISO DE H° S° (E=5CM): | M² | 48,16 |
| 763 | 706838 | PROV. E INST. CERAMICA NACIONAL: | M² | 106,32 |
| 764 | 706839 | PROV. E INST. ZOCALO DE CERAMICA NACIONAL: | M | 96 |
| 765 | 706840 | REVESTIMIENTO CERAMICA NACIONAL: | M² | 13,68 |
| 766 | 706841 | REVOQUE DE CEMENTO: | M² | 38,4 |
| 767 | 706842 | PROV. E INST. PUERTA DE MADERA ROBLE (2x1 M): | PZA | 9 |
| 768 | 706843 | PROV. E INST. VENTANA DE ALUMINIO INCL/VIDRIO DOBLE: | M² | 13,48 |
| 769 | 706844 | PROV. E INSTALACION SANITARIA (TAZA, LAVAMANOS Y DUCHA): | GLB | 2 |
| 770 | 706845 | PROV. E INST. LAVAPLATOS INCL /ACCESORIOS Y GRIFO: | GLB | 1 |
| 771 | 706846 | PROV. E INSTAL. REJAS DE PROTECCION DE VENTANAS: | M² | 7,98 |
| 772 | 706847 | PROV E INSTAL BARANDA DE FIERRO FORJADO: | M | 6,06 |
| 773 | 706848 | EXCAVACION EN ROCA:: | M³ | 31,48 |
| 774 | 706849 | MURO DE LADRILLO -12CM:: | M² | 590,4 |
| 775 | 706850 | PROV.COLOC.PUERTA MET.:: | M² | 45 |
| 776 | 706851 | CIMIENTO DE H° C° H18 (50% PD):: | M³ | 31,48 |
| 777 | 706852 | SOBRECIMIENTO DE H° C° H18 (50% PD):: | M³ | 11,8 |
| 778 | 706853 | HO.AO.COLUMNAS(ESTRUT.CORRIENTES)H21 NBH:: | M³ | 9,23 |
| 779 | 706854 | HO.CO.ELEVACIONES ESTABILIZACION (HO 1:2:4-50 % PIEDRA):: | M³ | 280 |
| 780 | 706855 | EXCAVACION EN ROCA:, | M³ | 6,48 |
| 781 | 706856 | CIMIENTO DE H° C° H18 (50% PD):, | M³ | 6,84 |
| 782 | 706857 | SOBRECIMIENTO DE H° C° H18 (50% PD):, | M³ | 1,64 |
| 783 | 706858 | HO.AO.COLUMNAS(ESTRUT.CORRIENTES)H21 NBH:, | M³ | 3,38 |
| 784 | 706859 | VIGA DE ARRIOSTRE H° A° H21:, | M³ | 5,33 |
| 785 | 706860 | MURO DE LADRILLO -12CM:, | M² | 88,69 |
| 786 | 706861 | PROV.COLOC.PUERTA MET.:, | M² | 3,75 |
| 787 | 706862 | PROV. E INST. CUBIERTA DE CALAMINA GALVANIZADA N° 28 INCL/CERCHA METALICA:, | M² | 93,38 |
| 788 | 706863 | EXCAVACION EN ROCA:,, | M³ | 728 |
| 789 | 706864 | HORMIGON FC=230 KG/CM2:,, | M³ | 194,17 |
| 790 | 706865 | PROV. E INST. ACERO ESTRUCTURAL:,, | KG | 23242,77 |
| 791 | 706866 | PROV. E INST. CAMARA DE HºAº H21 - LLEGADA TANQUENº2 LOMAS DE JUNIO:,, | GLB | 1 |
| 792 | 706867 | PROV. E INST. CAMARA DE HºAº H21 - SALIDA TANQUE Nº2 VILLA ISRAEL A DISTRIBUCION:,, | GLB | 1 |
| 793 | 706868 | DADO DE HORMIGON CICLOPEO R 180:,, | M3 | ,64 |
| 794 | 706869 | PROV. E INST. CAMARA DE HºAº H21 -REBALSE:,, | GLB | 1 |
| 795 | 706870 | PROVISION ACCESORIOS REBALSE Y DRENAJE TANQUE LOMAS DE JUNIO:,, | GLB | 1 |
| 796 | 706871 | INSTALACION ACCESORIOS REBALSE Y DRENAJE TANQUE LOMAS DE JUNIO:,, | GLB | 1 |
| 797 | 706872 | PROVISION ACCESORIOS LLEGADA TANQUE 2 - PARTE 1:,, | GLB | 1 |
| 798 | 706873 | INSTALACION ACCESORIOS LLEGADA TANQUE 2 - PARTE 1:,, | GLB | 1 |
| 799 | 706874 | PROVISION ACCESORIOS LLEGADA TANQUE 2 - PARTE 2:,, | GLB | 1 |
| 800 | 706875 | INSTALACION ACCESORIOS LLEGADA TANQUE 2 - PARTE 2:,, | GLB | 1 |
| 801 | 706876 | PROVISION ACCESORIOS SALIDA TANQUE 2 A DISTRIBUCION:,, | GLB | 1 |
| 802 | 706877 | INSTALACION ACCESORIOS SALIDA TANQUE 2 A DISTRIBUCION:,, | GLB | 1 |
| 803 | 706878 | PROVISION FLUJOMETRO ELECTROMAGNETICO PN16 DN400MM:,, | PZA | 1 |
| 804 | 706879 | INSTALACION FLUJOMETRO ELECTROMAGNETICO PN16 DN400MM:,, | PZA | 1 |
| 805 | 706880 | IMPLEMENTACION DE CCTV ALTO LOMAS DE JUNIO:,, | GLB | 1 |
| 806 | 706881 | INSTALACION DE FAENAS:. | GLB | 1 |
| 807 | 706882 | REPLANTEO E INSPECCIÓN DE LA LÍNEA DE BT:. | GLB | 1 |
| 808 | 706883 | TRANSPORTE DE MATERIALES GENERALES:. | GLB | 1 |
| 809 | 706884 | CONSTRUCCION DE PILASTRA PARA PUESTO MEDIDOR:. | GLB | 1 |
| 810 | 706885 | PROV. E INST. DE MEDIDOR MONOFASICO Y ACCESORIOS:. | GLB | 1 |
| 811 | 706886 | SERVICIO DE MEDICIÓN DE PAT (TIERRA):. | GLB | 1 |
| 812 | 706887 | AJUSTE Y PRUEBAS:. | GLB | 1 |
| 813 | 706888 | ARMADO DE ESTRUCTURA J17:. | PZA | 1 |
| 814 | 706889 | INSTALACIÓN DE PUESTA A TIERRA VM2-11:. | PZA | 1 |
| 815 | 706890 | PROV. E INST. CABLE 6 MM2:. | ML | 18 |
| 816 | 706891 | PROV. E INST. TUBO EMT 3/4:. | M | 100 |
| 817 | 706892 | PROV. E INST. TUBO EMT 1:. | M | 10 |
| 818 | 706893 | PROV. E INST. TUBO PVC 3/4:. | M | 190 |
| 819 | 706894 | CONST. CAMARA DE PASO ELECTRICA 30 X 30 CM:. | GLB | 2 |
| 820 | 706895 | PROV. E INST. LUMINARIA 200W IP66 EN POSTE 7M BRAZO SIMPLE:. | PZA | 8 |
| 821 | 706896 | PROV. E INST. TABLERO ELECTRICO VIVIENDA:. | PZA | 1 |
| 822 | 706897 | PROV. E INST. PANEL DE ILUMINACION LED 18W 220V 1620LM:. | PZA | 21 |
| 823 | 706898 | PROV. E INST. TOMACORRIENTES 2P+T 16A DOBLE EN PLACA:. | GLB | 17 |
| 824 | 706899 | PROV. E INST. INTERRUPTOR SIMPLE 10A 220V:. | PZA | 4 |
| 825 | 706900 | PROV. E INST. INTERRUPTOR DOBLE 10A 220V:. | PZA | 1 |
| 826 | 706901 | PROV. E INST. INTERRUPTOR CONMUTADOR 10A 220V:. | PZA | 2 |
| 827 | 706902 | PROV. E INST. CAJA PROTECCION DUCHA ELECTRICA:. | PZA | 2 |
| 828 | 706903 | PROV. E INST. CABLE 2,5 MM2 70º 750V:. | M | 1200 |
| 829 | 706904 | PROV. E INST. CABLE 4 MM2 70º 750V:. | ML | 300 |
| 830 | 706905 | PROV. E INST. CABLE 6 MM2 70º 750V:. | ML | 120 |
| 831 | 706906 | EXCAVACION TERRENO ROCA H= 0 - 2 M.: | M³ | ,33 |
| 832 | 706907 | HORMIGON CICLOPEO R180.: | M3 | ,25 |
| 833 | 706908 | PROV. E INST. CLAPETA METALICA Y ACCESORIOS.: | GLB | 1 |
| 834 | 706909 | SERVICIO DE MEDICION DE NIVEL DE RUIDOS.: | PTO | 60 |
| 835 | 706910 | HUMEDECIMIENTO DE ÁREA DE TRABAJO.: | M² | 6885 |
| 836 | 706911 | PROVISIÓN Y COLOCADO DE PLANTINES.: | PTO | 100 |
| 837 | 706912 | EVALUACIÓN PRELIMINAR AMBIENTAL.: | GLB | 1 |
| 838 | 706913 | SEÑALIZACION Y GESTION DE RESIDUOS.: | GLB | 1 |
| 839 | 706914 | DESARROLLO COMUNITARIO.: | GLB | 1 |